Lean Precast Production System Based on the CONWIP Method

논문상세정보
    • 저자 Xiaodan Li Zhongfu Li Guangdong Wu
    • 제어번호 106037321
    • 학술지명 KSCE Journal of Civil Engineering
    • 권호사항 Vol. 22 No. 7 [ 2018 ]
    • 발행처 대한토목학회
    • 자료유형 학술저널
    • 수록면 2167-2177
    • 언어 English
    • 출판년도 2018
    • 등재정보 KCI등재
    • 소장기관 영남대학교 과학도서관
    • 판매처
    유사주제 논문( 0)

' Lean Precast Production System Based on the CONWIP Method' 의 참고문헌

  • Using common random numbers for indifference-zone selection and multiple comparisons in simulation
  • Simulation-based planning for precast production with two critical resources
    Zhai, X. [2008]
  • Simulation optimisation of pull control policies for serial manufacturing lines and assembly manufacturing systems using genetic algorithms
  • Simulation in manufacturing and business: A review
  • Simulation as a Tool for Productivity Modeling of Precast Concrete Installation
  • Robust manufacturing line design with controlled moderate robustness in bottleneck buffer time to manage stochastic inter-task times
  • Quality function deployment modelling to enhance industrialised building system adoption in housing projects
  • Productivity improvement of precast shop drawings generation through BIM-based process re-engineering
    Nath, T. [2015]
  • Productivity gains in a line flow precast concrete process after a basic stability effort
  • Process reengineering and improvement for building precast production
  • Precast production scheduling using multi-objective genetic algorithms
    Ko, C.-H. [2011]
  • Perspectives of UK housebuilders on the use of offsite modern methods of construction
    Pan, W. [2007]
  • Optimal design of a hybrid push/pull serial manufacturing system with multiple part types
  • Open source simulation Software 'JAAMSIM'
  • Multi-objective optimization of production control mechanisms for multi-stage serial manufacturing-inventory systems
  • Modified CONWIP systems: A review and classification
    Prakash, J. [2014]
  • Materials handling system simulation in precast viaduct construction: Modeling, analysis, and Implementation
    Chan, W.-H. [2008]
  • Journey toward Lean Construction: Pursuing a Paradigm Shift in the AEC Industry
  • Integrated simulation-optimisation of pull control systems
  • Integrated prefabrication configuration and component grouping for resource optimization of precast production
    Khalili, a. [2014]
  • Identification of Non-value Adding (NVA) activities in precast concrete installation sites to achieve low-carbon installation
    Wu, P. [2013]
  • GA-based decision support systems for precast production planning
    Ko, C. H. [2010]
  • Flowshop scheduling model for bespoke precast concrete production planning
  • Factory physics. Business Logistics
    Hopp, W. J. [1996]
  • Exploring the challenges to industrialized residential building in China
    Zhang, X. [2014]
  • Dynamic card control strategy in pull manufacturing systems
    Renna, P. [2013]
  • Dispatching strategies for managing uncertainties in automated manufacturing systems
    Jain, S. [2016]
  • Causes and penalties of variation: case study of a precast concrete slab production facility
    Wang, C. [2013]
  • CONWIP, a pull alternative to kanban
  • CONWIP card setting in a flow-shop system with a batch production machine
    Braglia, M. [2011]
  • Barriers to implementation of the Industrialised Building System (IBS) in Malaysia
    Nawi, M. [2011]
  • Arranging precast production schedules using genetic algorithms, (Eppm)
    Ko, C. [2013]
  • Application of discrete event simulation and conwip on inventory control
    Lu, W. [2010]
  • An exploration towards a production theory and its application to construction
    Koskela, L. [2000]
  • An adaptive CONWIP mechanism for hybrid production systems
    Korugan, A. [2014]
  • A genetic algorithm approach for multi-product multi-machine CONWIP production system
    Ajorlou, S. [2011]