Application of Big Bang - Big Crunch Optimization to Resource Constrained Scheduling Problems

논문상세정보
    • 저자 Y. Cengiz Toklu
    • 제어번호 105944312
    • 학술지명 KSCE Journal of Civil Engineering
    • 권호사항 Vol. 22 No. 12 [ 2018 ]
    • 발행처 대한토목학회
    • 자료유형 학술저널
    • 수록면 4760-4770
    • 언어 English
    • 출판년도 2018
    • 등재정보 KCI등재
    • 소장기관 경북대학교 중앙도서관 영남대학교 과학도서관
    • 판매처
    유사주제 논문( 0)

' Application of Big Bang - Big Crunch Optimization to Resource Constrained Scheduling Problems' 의 참고문헌

  • Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems
  • Use of Genetic Algorithms in Resource Scheduling of Construction Projects
  • Theoretical and numerical constraint-handling techniques used with evolutionary algorithms: a survey of the state of the art
  • The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm
  • Solving Resource-Constrained Project Scheduling Problems Using Hybrid Artificial Bee Colony with Differential Evolution
  • Solution of constrained optimization problems by multi-objective genetic algorithm
  • Size optimization of space trusses using Big Bang–Big Crunch algorithm
    A. Kaveh [2009]
  • Search Heuristics for Resource Constrained Project Scheduling
  • Robust global and local search approach to resource-constrained project scheduling
    Jin-Lee Kim [2009]
  • Resource-constrained project scheduling: Notation, classification, models, and methods
  • Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
    Sou-Sen Leu [2000]
  • Resource Optimization Using Combined Simulation and Genetic Algorithms
  • Project scheduling for minimizing temporary availability cost of rental resources and tardiness penalty of activities
  • Permutation-based elitist genetic algorithm for using serial scheme for large-sized resource-constrained project scheduling
    Kim, J.-L. [2007]
  • Permutation-Based Elitist Genetic Algorithm for Optimization of Large-Sized Resource-Constrained Project Scheduling
    Jin-Lee Kim [2008]
  • Particle swarm optimization for resource-constrained project scheduling
    Hong Zhang [2006]
  • Optimal trajectory planning by Big Bang-Big Crunch algorithm
    Yilmaz, S. [2014]
  • Metaheuristics for project and construction management – A state-of-the-art review
  • Meta-heuristic approaches for solving resource constrained project scheduling problem: A comparative study
    Das, P. P. [2011]
  • Improved genetic algorithm for resource-constrained scheduling of large projects
    Jin-Lee Kim [2009]
  • Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
    Po-Han Chen [2009]
  • Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling
  • Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources
  • Differential Big Bang - Big Crunch algorithm for construction-engineering design optimization
  • Design of Space Trusses Using Big Bang–Big Crunch Optimization
  • Construction scheduling using Genetic Algorithm based on Building Information Model
  • Construction imitating ants: Resource-unconstrained scheduling with artificial ants
  • Constraint handling in genetic algorithms using a gradient-based repair method
  • Big-bang big-crunch optimization in locating the critical surface in slope-stability
    Saha, A. [2013]
  • Big Bang–Big Crunch optimization method in optimum design of complex composite laminates
  • Bi-objective resource-constrained project scheduling with robustness and makespan criteria
  • Bearing-only target tracking based on Big Bang - Big Crunch algorithm
    Genc, H. M. [2008]
  • Automation in construction scheduling: a review of the literature
  • Application of genetic algorithms to construction scheduling with or without resource constraints
  • Ant colony optimization for the nonlinear resource allocation problem
  • An effective ant colony optimization algorithm (ACO) for multi-objective resource allocation problem (MORAP)
  • Adaptive fuzzy model based inverse controller design using BB-BC optimization algorithm
  • A tabu search approach for the resource constrained project scheduling problem
  • A review of methods and algorithms for optimizing construction scheduling
    Zhou, J. [2017]
  • A random key based genetic algorithm for the resource constrained project scheduling problem
  • A new optimization method: Big Bang–Big Crunch
  • A hybrid genetic algorithm for the discrete time–cost trade-off problem
  • A framework for integration model of resourceconstrained scheduling using genetic algorithms
    Kim, J.-L. [2005]