Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects

논문상세정보

' Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects' 의 참고문헌

  • Work continuity constraints in project scheduling
    Mario, V. [2006]
  • Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis
    Yang, I.-T. [2007]
  • Time-profit trade-off analysis for construction projects
    Ahmed, S. [2009]
  • Time-cost-quality trade-off analysis for highway construction
  • The discrete time/cost trade-off problem: Extensions and heuristic procedures
  • System development for non-unit based repetitive project scheduling
  • Symbiotic organisms search: A new metaheuristic optimization algorithm
  • Symbiotic organisms search and two solution representations for solving the capacitated vehicle routing problem
    Yu, V. F. [2017]
  • Solution to the time-cost-quality trade-off problem in construction projects based on immune genetic particle swarm optimization
    Zhang, L. [2014]
  • Scheduling/cost optimization and neural dynamics model for construction
    Hojjat, A. [1997]
  • Scheduling projects with repeating activities
  • SOS optimization model for bridge life cycle risk evaluation and maintenance strategies
  • Reserve-constrained multiarea environmental/economic dispatch based on particle swarm optimization with local search
    Wang, L. [2009]
  • Repetitive scheduling method: Requirements, modeling, and implementation
  • RPM: Repetitive project modeling
  • Project management with time, cost, and quality considerations
  • Performance assessment of multiobjective optimizers: an analysis and review
    Zitzler, E. [2003]
  • Optimizing the utilization of multiple labor shifts in construction projects
    Jun, D. H. [2010]
  • Optimizing resource utilization for repetitive construction projects
  • Optimizing construction time and cost using ant colony optimization approach
    Ng, S. [2008]
  • Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search
    Cheng, M. [2005]
  • Optimized scheduling of linear projects
    Moselhi, O. [2003]
  • Optimized acceleration of repetitive construction projects
    Bakry, I. [2014]
  • Optimal scheduling of probabilistic repetitive projects using completed unit and genetic algorithms
  • Optimal repetitive scheduling model with shareable resource constraint
    Sou-Sen, L. [2001]
  • Optimal planning and scheduling for repetitive construction projects
    Khalied, H. [2006]
  • Opposition-based multiple objective differential evolution (OMODE) for optimizing work shift schedules
  • Opposition-based learning in the shuffled differential evolution algorithm
  • Opposition-based differential evolution
  • Opposition-Based Multiple-Objective Differential Evolution to Solve the Time-Cost-Environment Impact Trade-Off Problem in Construction Projects
  • Nondominated archiving multicolony ant algorithm in timecost trade-off optimization
    Afshar, A. [2009]
  • Non-unit-based planning and scheduling of repetitive construction projects
  • Multiobjective optimization in linear repetitive project scheduling
  • Multiobjective linear programming model for scheduling linear repetitive projects
  • Multiobjective evolutionary algorithms: A comparative case study and the strength Pareto approach
    Zitzler, E. [1999]
  • Multi-objective self-adaptive differential evolution with elitist archive and crowding entropy-based diversity measure. Soft Computing - A Fusion of Foundations
    Wang, Y.-N. [2010]
  • Multi-mode resource-constrained discrete time-costresource optimization in project scheduling using non-dominated sorting genetic algorithm
  • Multi objective optimization for scheduling repetitive projects using GA
    Mathew, J. [2016]
  • Modeling the permanent deformation behavior of asphalt mixtures using a novel hybrid computational intelligence
  • Mixed-integer linear programming approach for scheduling repetitive projects with time-cost trade-off consideration
    Xin, Z. [2017]
  • Metaheuristics for project and construction management - A state-of-the-art review
    Liao, T. W. [2011]
  • Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions
    Su, Yi,. [2016]
  • Linear scheduling model with varying production rates
  • Hybrid symbiotic organisms search optimization algorithm for scheduling of tasks on cloud computing environment
  • Hybrid multiple objective artificial bee colony with differential evolution for the time-cost-quality tradeoff problem
    Tran, D.-H. [2015]
  • Genetic algorithm-based multi-objective model for scheduling of linear construction projects
    Senouci, A. [2008]
  • Genetic algorithm-based method for the deadline problem in repetitive construction projects considering soft logic
  • GA optimization model for repetitive projects with soft logic
    Fan, S.-L. [2012]
  • Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction
    Zhang, H. [2010]
  • Fuzzy repetitive scheduling method for projects with repeating activities
  • Fuzzy clustering chaotic-based differential evolution for resource leveling in construction projects
  • Finance-based scheduling using metaheuristics: Discrete versus continuous optimization problems
  • Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities
    Ali, M. M. [2009]
  • Extensions to linear scheduling optimization
    Alan, D. R. [1988]
  • Evolutionary multi-objective optimization: A historical view of the field
  • Environmental/economic power dispatch problem using multi-objective differential evolution algorithm
    Wu, L. H. [2010]
  • Enhanced trade-off of construction projects: Financeresource-profit
    Ashraf, E. [2014]
  • Enhanced opposition-based differential evolution for solving high-dimensional continuous optimization problems
    Wang, H. [2011]
  • Enhanced heuristic for finance-based scheduling of construction projects
    Gajpal, Y. [2015]
  • Distributed scheduling model for infrastructure networks
    Tarek, H. [2004]
  • Construction planning for linear projects
  • Computational Intelligence for Modelling, Control and Automation
  • Cash flow modeling for construction projects
    Tarek, Z. [2014]
  • Automated trade-off between time and cost in planning repetitive construction projects
  • An overview of evolutionary algorithms in multiobjective optimization
  • An innovative time-cost-quality tradeoff modeling of building construction project based on resource allocation
    Hu, W. [2014]
  • An efficient differential evolution based algorithm for solving multi-objective optimization problems
    Ali, M. [2012]
  • A two-phase GA model for resource-constrained project scheduling
    Chen, P.-H. [2009]
  • A symbiotic organisms search algorithm with adaptive penalty function to solve multi-objective constrained optimization problems
    Panda, A. [2016]
  • A review of opposition-based learning from 2005 to 2012
    Xu, Q. [2014]
  • A review of methods and algorithms for optimizing construction scheduling
    Zhou, J. [2013]
  • A novel symbiotic organisms search algorithm for congestion management in deregulated environment
    Verma, S. [2017]
  • A novel multiple objective symbiotic organisms search (MOSOS) for time-cost-labor utilization tradeoff problem
    Tran, D.-H. [2016]
  • A novel implementation of natureinspired optimization for civil engineering: A comparative study of symbiotic organisms search
    Prayogo, D. [2017]
  • A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems
    Tavana, M. [2014]
  • A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations
  • A multi-objective artificial bee colony algorithm
    Akbari, R. [2012]
  • A genetic algorithm-based method for scheduling repetitive construction projects
    Long, L. D. [2009]
  • A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: A case study of highway construction project
    Mungle, S. [2013]
  • A fast and elitist multiobjective genetic algorithm: NSGA-II