Complete Time Algorithm for Stadium Construction Scheduling Problem

Sang-Un Lee 2015년
논문상세정보
' Complete Time Algorithm for Stadium Construction Scheduling Problem' 의 주제별 논문영향력
논문영향력 선정 방법
논문영향력 요약
주제
  • criticalpath
  • earliestendingtime
  • losscost
  • optimal point
  • profit cost
동일주제 총논문수 논문피인용 총횟수 주제별 논문영향력의 평균
12 0

0.0%

' Complete Time Algorithm for Stadium Construction Scheduling Problem' 의 참고문헌

  • Using Modified Dijkstra's Algorithm for Critical Path Method in a Project Network
    N. R. Shankar International Journal of Computational and Applied Mathematics 5 (2) : 217 ~ 225 [2010]
  • Towards an AoA-Free Courseware for the Critical Path Method
    M. Sniedovich INFORMS Transactions on Education 5 (2) [2005]
  • Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects and Builders
  • Introduction to Economics; Chapter 6. How Firms make Decisions: Profit Maximization, 2ed
    M. Rieberman South-Western/Thomson Learning [2005]
  • Critical Path in Software Management
    C. Z. D. Santos Interactive Systems & Consulting Inc [2005]
  • Critical Path Planning and Scheduling: Mathematical Basis
    K. James Operations Research 9 (3) : 296 ~ 320 [1961]
  • COSC 621: Advanced Construction Project Scheduling and Management
    J. H. Kang Department of Construction Science, College of Architecture, Texas A&M University [2005]
  • Applications of Optimization with Xpress-MP: 7.1 Construction of a Stadium
    C. Guéret Dash Optimization Ltd. : 81 ~ 86 [2005]
  • An Activity and Arrow Arranging Algorithm for Clarity in Schedule Network Diagrams
    G. Lucko Joint International Conference on Computing and Decision Making in Civil and Building Engineering : 752 ~ 761 [2006]
  • A New Approach for Constructing and Generating AOA Networks
    Y. Cohen Journal of Engineering, Computing and Architecture 1 (1) : 1 ~ 13 [2007]