건설 프로젝트 다차원 성과지표 최적화 시스템

논문상세정보
' 건설 프로젝트 다차원 성과지표 최적화 시스템' 의 주제별 논문영향력
논문영향력 선정 방법
논문영향력 요약
주제
  • analytic hierarchy process
  • genetic algorithm
  • multi-objective optimization
  • scheduling
  • tradeoff analysis
  • 계층 분석법
  • 다목적 최적화
  • 유전 알고리즘
  • 일정계획
  • 최적관계 분석
동일주제 총논문수 논문피인용 총횟수 주제별 논문영향력의 평균
1,240 1

0.0%

' 건설 프로젝트 다차원 성과지표 최적화 시스템' 의 참고문헌

  • 전략적 의사결정 기법 AHP
    권재현 도서출판 청람 [2012]
  • Using machine learning and GA to solve time-cost trade-off problems
    Li, H. Journal of Construction Engineering and Management 125 (5) : 347 ~ 353 [1999]
  • Using improved genetic algorithms to facilitate time-cost optimization
    Li, H. Journal of Construction Engineering and management 123 (3) : 233 ~ 237 [1997]
  • Using genetic algorithms to solve construction time-cost trade-off problems
    Feng, C. W. Journal of computing in civil engineering 11 (3) : 184 ~ 189 [1997]
  • Time-cost-quality trade-off analysis for highway construction
    El-Rayes, K. Journal of construction Engineering and Management 131 (4) : 477 ~ 486 [2005]
  • Time, cost, and environmental impact analysis on construction operation optimization using genetic algorithms
    Ozcan-Deniz, G. Journal of Management in Engineering 28 (3) : 265 ~ 272 [2011]
  • The use of analytical hierarchy process in priority rating of pavement maintenance
    Danial, M. Scientific Research and Essays 6 (12) : 2447 ~ 2456 [2011]
  • The analytic hierarchy process : planning, priority setting, resource allocation
    Saaty, T. L. McGraw-Hill [1980]
  • Stochastic time–cost optimization using non-dominated archiving ant colony approach
    Kalhor, E. Automation in Construction 20 (8) : 1193 ~ 1203 [2011]
  • Stochastic construction time-cost trade-off analysis
    Feng, C. W. Journal of Computing in Civil Engineering 14 (2) : 117 ~ 126 [2000]
  • Schedule compression using the direct stiffness method
    Moselhi, O. Canadian Journal of Civil Engineering 20 (1) : 65 ~ 72 [1993]
  • Optimizing strategy software for repetitive construction projects within multi-mode resources
    Aziz, R. F. Alexandria Engineering Journal 52 (3) : 373 ~ 385 [2013]
  • Optimizing construction time and cost using ant colony optimization approach
    Ng, S. T. Journal of Construction Engineering and Management 134 (9) : 721 ~ 728 [2008]
  • Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T. Canadian Journal of Civil Engineering 26 (6) : 685 ~ 697 [1999]
  • Multiobjective optimization of time-cost trade-off using harmony search
    Geem, Z. W. Journal of Construction Engineering and Management 136 (6) : 711 ~ 716 [2009]
  • Multi-objective optimization of time-cost-quality using multi-colony ant algorithm
    Afshar, A. Asian Journal of Civil Engineering 8 (2) : 113 ~ 124 [2007]
  • MACROS: Multiobjective automated construction resource optimization system
    Kandil, A. Journal of Management in Engineering 22 (3) : 126 ~ 134 [2006]
  • How to make a decision : the analytic hierarchy process
    Saaty, T. L. European journal of operational research 48 (1) : 9 ~ 26 [1990]
  • Handling construction pollutions using multi‐objective optimization
    Marzouk, M. Construction Management and Economics 26 (10) : 1113 ~ 1125 [2008]
  • Guidelines for warranty, multi-parameter, and best value contracting (No. Project 10-49 FY'96)
  • Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction
    Zhang, H. Automation in Construction 19 (8) : 1067 ~ 1075 [2010]
  • Extensions of the critical path method through the application of integer programming
    Meyer, W. L. Department of Civil Engineering, University of Illinois [1963]
  • Environmental Planning:analytic network process model for environmentally conscious construction planning
    Chen, Z. Journal of construction engineering and management 13 (1) [2005]
  • Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project
    Xu, J. International Journal of Project Management 30 (8) : 950 ~ 966 [2012]
  • Decision making with the Analytic Hierarchy Process
    Saaty, T. L. International journal of services sciences 1 (1) : 83 ~ 98 [2008]
  • Critical-path planning and scheduling
    Kelley Jr, J. E. IRE-AIEE-ACM computer conference : 160 ~ 173 [1959]
  • Critical success factors for different project objectives
    Chua, D. K. H. Journal of construction engineering and management 125 (3) : 142 ~ 150 [1999]
  • Computer-based construction project management
    Hegazy, T. Prentice Hall [2002]
  • Comparison among five evolutionary-based optimization algorithms
    Elbeltagi, E. Advanced engineering informatics 19 (1) : 43 ~ 53 [2005]
  • Basic theory of the analytic hierarchy process: how to make a decision, Revista de la Real Academia de Ciencias Exactas
    Saaty, T. L. Físicas y Naturales 93 (4) : 395 ~ 423 [1999]
  • A structural method of computing project cost polygons
    Prager, W. Management Science 9 (3) : 394 ~ 404 [1963]
  • A simple CPM time-cost tradeoff algorithm
    Siemens, N. Management Science 17 (6) : B ~ 354 [1971]
  • A non-computer approach to the critical path method for the construction industry
  • A modified shuffled frog-leaping optimization algorithm: applications to project management
    Elbeltagi, E. Structure and Infrastructure Engineering 3 (1) : 53 ~ 60 [2007]
  • A dynamic programming solution to cost-time tradeoff for CPM
    Robinson, D. R. Management Science 22 (2) : 158 ~ 166 [1975]