[8] www.wikipedia.org, Liste of automated train systems.
[7] P. Menesplier, A. Gue, J. Naoufal, J. Longo, F. Benoit (2018) World’s best driverless metro line 2017 : étude du marché du métro automatique et bench- mark de la performance des réseaux, WAVESTONE report, Paris.
[2018]
[6] J.F. Sanchez, A du Chene, A, Raynaud (2009) Etude systemes de transport (SETEC TPI/XELIS), Stif report, Paris.
[2009]
[63] S.C. Oh, Y. K. Yoon, K. H. Kim, Y.K. Kim, (2013), Design of ATP functions and Communication Interface Specifications for Korean Radio-based Train Control System, 2013 ICCAS, Gwangju, Korea, pp. 1330-1333.
[2013]
[5] European Railway signalling, Project Group under the auspices of the Institution of Railway signal Engineers, general editor : colin Bailey, A&C Black, London, 1995
[1995]
[58] Y.S. Song, J.Y. Kim, S.W. Choi, Y.K. Kim (2016) Long term evolution for wireless railway communications: Testbad deployment and performance evaluation, IEEE Communications Magazine, February 2016, pp. 2-9.
[2016]
[56] Mitsubishi Electric Corporation (2020), Mitsubishi Electric Qualified as CBTC Supplier by New York City Transit Aims to participate in upcoming modernization of city's subway signaling systems, Tokyo, Japon.
[54] U.S. Department of Transportation (2011) Communication Based Train Control(CBTC) before/after cost effectiveness study, Report No. FTA-TX-26-7005, Washington, D.C.
[2011]
[53] C. Braban, P. Charon (2010) Re-signaling the Paris Line 1: from driver-based to driverless operation, Advanced Train control system, WIT Transactions on State of the Art in Science and Engineering, Vol 46, WIT Press, Ashurst, pp. 45-53.
[2010]
[52] G. Brodeo (2016) Automation in urban public transportation, RATP report, Paris.
[2016]
[51] J. Iglesias, A. Arranz, M. Cambronero, C. de la Roza, B. Domingo, J. Tamarit, J. Bueno, C. Arias (2011), ERTMS deployment in Spain as a real demonstration of interoperability. Near future challenges, WCRR 2011, Lille, France.
[2011]
[50] European Railway Agency (2011), Guide for the application of Technical Specifications for Interoperability(TSIs), ERA/GUI/07-2011/INT Version:1.02, Valenciennes, France, pp 1-61
[2011]
[4] J. Pellegrin, P. Bernard, D. Lancien (1995), D'ASTREE a ETCS ou dix ans de recherche sur la future signalization ferroviaire europeenne, Revue generale des chemins de fer, No 11, DUNOD, Paris, France.
[48] UNISIG (2014), Hazard Items for Baselines Compatibility Assessment SUBSET-128.
[2014]
[47] UNISIG (2016), Safety requirement for the technical interoperability of ETCS in Levels 1 & 2, SUBSET-091.
[2016]
[46] UNISIG (2014), ETCS System Version Management, SUBSET-104.
[2014]
[45] UNISIG (2005), Performance Requirements for Interoperability, SUBSET-041.
[2005]
[44] F. Jaeger (2006), ETCS level 1 deployment in luxembourg, 2006 UIC ERTMS conference, Budapast, Poland.
[2006]
[43] L. Zigterman (2016), ERTMS and Compatibility, ERTMS world conference 2016, Brussels, Belgium.
[2016]
[41] IRSE International Technical Committee, Semi-automatic, driverless, and unattended operation, 2009. IRSE news Issue 150 of trains
[2009]
[40] G. Yelloz, Paris metro line 1 Migration into a full driverless line, (2010), CBTC World congress, PARIS.
[2010]
[39] Gec Alsthom signalling Group (1999), EUROATC for classic lines.
[1999]
[38] ㅣ‘Evolution du control-commande des lignes a grande vitesse de la SNCF (1995), Revue generale des chemins de fer, Mai, 1995, pp5-12, DUNOD
[1995]
[37] Transport ferroviaire : ASTREE ou revolution dans la gestion du traffic ferroviaire (1997), Technologie France, No 8, ADIT , France
[1997]
[36] J. Pieriegud (2018), Digital transformation of Railways, ISBN 978-83- 950826-0-3.
[2018]
[35] F. Yan, Safety and Security Analysis in Automated Urban Guided Transport Systems using STPA, 4th European STAMP workshop, Zurich, Switzerland.
[34] J. P. Powel1, A. Fraszczyk1, C. N. Cheong1, H. K. Yeun (2016), Potential Benefits and Obstacles of Implementing Driverless Train Operation on the Tyne and Wear Metro: A Simulation Exercise, Urban Rail Transit, pp. 114–127,
[2016]
[32] J.F. Sanchez, A du Chene, A, Raynaud (2009) Etude systemes de transport (SETEC TPI/XELIS), Stif report, Paris.
[2009]
[31] N. Estivals (2011) OCTYS CBTC project, RATP report, Paris.
[2011]
[30] www.uitp.org, World metro figures 2018.
[2018]
[29] UITP (2011), Metro automation facts, figure and trends - A global bid for automation : UIPT observatory of Automated Metros confirms sustained growth rates for the coming years, UITP press & media manager, Paris.
[2011]
[28] J.M. Cohen, A.S.5] Barron, R.J. Anderson, D.J. Graham (2015) Compacts of unattended train operations on productivity and efficiency in metropolitan railways, Journal of the Transportation Research Board, No 2534, Washington, D.C., pp. 75 –83.
[2015]
[27] Y.K. Kim, Y.S. Song, S.C. OH (2012) Study on the plan of the KRTCS technology development unrelated to speed and operational environment, 2012 IASME-WSEAS, Athens, pp. 215-219.
[2012]
[26] E. See (2016) L’automatisation, pour plus d’efficavite, Colloque “La mobilite dans les villes europeennes” RATP report, Strasbourg.
[2016]
[25] G. Brodeo (2016) Automation in urban public transportation, RATP report, Paris.
[2016]
[19] S.C. Oh, M.S. Kim, K.M. Lee, Y. K. Kim (2013) Train control simulator design for KRTCS, 2013ICEMS, Busan, pp. 1334-1337.
[2013]
[18] C. Andlauer (2010) Modernization Program For Train Control Systems Interchangeability Concept, CBTC World congress, Paris, France
[2010]
[17] J.Y. Kim, S.W. Choi, Y.S. Song, Y.K. Yoon, Y.K. Kim (2015) Automatic train control over LTE : Design and performance evaluation, IEEE Communications Magazine, October 2015, pp. 102-109.
[13] E. Nicolas (2010) OCTYS CBTC Project, CBTC World congress, PARIS.
[2010]
[12] C. Braban, P. Charon (2010) Re-signaling the Paris Line 1: from driver-based to driverless operation, Advanced Train control system, WIT Transactions on State of the Art in Science and Engineering, Vol 46, WIT Press, Ashurst, pp. 45-53.
[2010]
[11] G. Colceag, G, Yelloz (2012) New York’s culver CBTC test track project, Metrorail, London, United Kingdom.
[2012]
[10] G. Colceag, G. Yelloz (2012), CBTC interoperability : from real needs to real deployments–New York culver CBTC test track project, Metrotrail, London.
[2012]
Survey on Driverless Train Operation for Urban Rail Transit Systems