박사

중소제조기업용 스마트 생산 스케줄링 시스템 구축 = Development of Smart Production Scheduling System Specialized for SMEs

이재용 2019년
논문상세정보
' 중소제조기업용 스마트 생산 스케줄링 시스템 구축 = Development of Smart Production Scheduling System Specialized for SMEs' 의 주제별 논문영향력
논문영향력 선정 방법
논문영향력 요약
주제
  • "Dispatching algorithms"
  • "Priority of task"
  • aps(advanced planning and scheduling)
  • scheduler
  • scheduling
  • smes
동일주제 총논문수 논문피인용 총횟수 주제별 논문영향력의 평균
812 0

0.0%

' 중소제조기업용 스마트 생산 스케줄링 시스템 구축 = Development of Smart Production Scheduling System Specialized for SMEs' 의 참고문헌

  • “The Fourth Industrial Revolution and SME Innovation Challenges (제 4차 산업혁명과 중소기 업 혁신과제)”
    Kim, H. S. Kim, J. J. Shin, J. Y. Korea Small Business Institute, pp. 1-72 [2017]
  • “Shortening Working Hours, Special Sector Reduction, Explanation of Revised Labor Standards Law Related to Civilian Application on Holidays (근로시간 단축, 특례업종 축소, 공휴일 민간 적용 관련 개정 근로기준법 설명자료)
    Cho, B. D. Ministry of Employment and Labor, pp. 1-99 [2018]
  • “SMEs' perceptions and responses to the Fourth Industrial Revolution (4차 산업혁명에 대한 중소기업인식 및 대 응조사 결과)”
    Han, J. Y. Lim, S. J. Korea Federation of SMEs, pp. 1-26 [2016]
  • “SMEs Statistics (중소기업통계 2016)”
    Park, S. T. Korea Federation of SMEs, 2016 [2016]
  • “Productivity Gap Analysis and Solution Plan by Company Size(기업규모별 생산성 격차 분석과 해소 방안)”
    Yu, B. K. Journal of i-KIET Industrial Economic Issues, No. 9, pp. 1-12 [2017]
  • “Machinery Industry First quarter of and Second Quarter Prospects - Results of the 59th Machinery Industry Trends Meeting (기계산업 ‘18년 1/4분기 실적과 2/4분기 전망 – 제59 회 기계산업 동향 연구회 결과)”
  • “Implementing Effective Orders and Implementing a Strategic Supply Chain(효과적인 주문이행과 전략적 공급망 구현)”
    Ham, H. Y. Oracle Software Powers the Internet, pp. 1-53 [2001]
  • “Domestic Smart Manufacturing Policy, Support Status and Improvement Plan (국내 스 마트 제조 정책과 지원 현황 및 개선 방안)”
    Koo, B. J. Lee, J. S. Lee, M. H. Son, S. H. Korea Institute of S&T Evaluation and Planning ISSUE WEEKLY, Vol. 219 [2018]
  • “Constraints and Improvement of Labor Productivity Improvement in Korea (우리나라 노동생산성 향상의 제약요인 및 제고 방안)”
    Yang, S. Y. KDB Monthly Bulletin, Vol. 9, No. 754, pp. 43-62 [2018]
  • “Analysis of the status of smart factory policy for leading manufacturing innovation and its implications (제조 업 혁신 주도를 위한 스마트공장 정책 현황 분석 및 시사점)”
    Shin, D. P. Yang, Y. N. KISTEP Issue Weekly, Vol. 250 [2018]
  • Zhang, R. and Chiong, R. “Solving the Energy-efficient Job Shop Scheduling Problem: A Multi-objective Genetic Algorithm with Enhanced Local Search for Minimizing the Total Weighted Tardiness and Total Energy Consumption”, Journal of Cleaner Production, Vol. 112, pp. 3361-3375, 2016.
  • Yu, Y. H., Cha, S. J. and Jo, G. S. “Hybrid Heuristic Applied by the Opportunity Time to Solve the Vehicle Routing and Scheduling Problem with Time Window”, Journal of Korea Intelligent Information Systems Society, Vol. 15, No. 3, pp. 137-150, 2009.
  • Yu, J. B., Yu, Y., Wang, L. N., Yuan, Z. and Ji, X. “The Knowledge Modeling System of Ready-mixed Concrete Enterprise and Artificial Intelligence with ANN-GA for Manufacturing Production”, Journal of Intelligent Manufacturing, Vol. 27, No. 4, pp. 905-914, 2016.
  • Yoon, K. W., Lee, P. L. and Woo, J. H. “An Data Integration of Manufacturing Plans of Heterogeneous Shipyard by Designing the Architecture of Standard Data Structure”, Proceedings of the Society of CAD/CAM Conference, pp. 1177-1182, 2014.
  • Yoo, G. J. “Korea Standard Industry Classification 2017”, Statics Korea, Copyright all rights reserved, Retrieved from http://kssc.kostat.go.kr, 2017.
  • Yilmaz, O. F. and Durmusoglu, M. B. “A Performance Comparison and Evaluation of Metaheuristics for a Batch Scheduling Problem in a Multi-hybrid Cell Manufacturing System with Skilled Workforce Assignment”, Journal of Industrial & Management Optimization, Vol. 14, No. 3, pp. 143-157, 2018.
  • Xiong, H., Huali, F., Guozhang, J. and Gongfa, L. “A Simulation-based Study of Dispatching Rules in a Dynamic Job Shop Scheduling Problem with Batch Release and Extended Technical Precedence Constraints”, European Journal of Operational Research, Vol. 257, No. 1, pp. 13-24, 2017.
  • Wu, L. D., Yang, J. Y., Zhou, Y. F. and Jeong, H. Y. “A Multi-Channel Scheduling MAC (MCS-MAC) Protocol for Wi-Fi Mesh Networks”, Journal of The Korean Institute of Communication Sciences, Vol. 37, No. 1, pp. 54-62, 2012.
  • Woo, J. H., Hwang, Y. S. and Nam, J. H. “An Approach for Construction of Shipyard Simulation Environment based on Neutral File Format”, Journal of the Society of Naval Architects of Korea, Vol. 53, No. 1, pp. 18-28, 2016.
  • Won, S. J. “Production Scheduling Considering Task Splitting and Merging using Genetic Algorithm”, [master’s thesis], [Seoul, Korea]: Pusan University, 2017.
  • Wasserman, S. and Faust, K. “Social Network Analysis”, New York, USA : Cambridge University Press. 1994.
  • Wardi, Y., Cassandras, C. G. and Cao, X. R. “Perturbation Analysis: A Framework for Data-driven Control and Optimization of Discrete Event and Hybrid Systems”, IFAC-PapersOnLine, Vol. 50, No. 1, pp. 3028-3038, 2017.
  • Vonder, S. V. D., Demeulemeester, E. and Herroelen, W. “A Classification of Predictive-reactive Project Scheduling Procedures”, Journal of Scheduling, Vol. 10, No. 3, pp. 195-207, 2007.
  • Vieira, G. E, Herrmann, J. E. and Lin, E. “Rescheduling Manufacturing Systems: A Framework of Strategies Policies and Methods”, Journal of Scheduling, Vol. 6, No. 1, pp. 39-62, 2003.
  • Timm, I. J., Woelk, P. O., Knirsch, P., Tonshoff, H. S. and Herzog, O. “Flexible Mass Customisation: Managing its Information Logistics Using Adaptive Cooperative Multi-agent Systems”, Developments in Logistics and Supply Chain Management, pp. 203-211, 2016.
  • Sven, S. “A Genetic Algorithm to Solve the Hybrid Flow Shop Scheduling Problem with Subcontracting Options and Energy Cost Consideration”, International Conference on Information Systems Architecture and Technology, pp. 263-273, 2018.
  • Suh, J. D. and Bruce, F. L. “A Real Time Integrated Dispatching Logic for Semiconductor Material Flow Control Considering Multi-load Automated Material Handling System”, Journal of the Korean Institute of Industrial Engineers, Vol. 34, No. 3, pp. 296-307, 2008.
  • Stadtler, H., Fleischmann, B., Grunow, M., Meyr, H. and S rie, C. “Advanced Planning in Supply Chains: Illustrating the Concepts Using an SAP APO Case Study”, Springer Science & Business Media, 2011.
  • Song, Y. J., Lee, D. K., Woo, J. H. and Shin, J. G. “A Shipyard Layout Design System by Simulation”, Journal of the Society of Naval Architects of Korea, Vol. 45, No. 4, pp. 441-454, 2008.
  • Song, M. G., Jung, C. H., Ji, S. D. “A study of Cluster Tool Scheduler Algorithm which is Support Various Transfer Patterns and Improved Productivity”, Journal of the Korea Society for Simulation, Vol. 19, No. 4, pp. 99-109, 2010.
  • Son, M. J. and Kim, T. W. “Job Assignment Simulation of Ship Hull Production Design in Consideration of Mid-Term Schedule”, Journal of the Society of Naval Architects of Korea, Vol. 50, No. 5, pp. 334-342, 2013.
  • Schlick, J. “Cyber-physical systems in factory automation-Towards the 4th industrial revolution”, 2012 9th IEEE International Workshop on Factory Communication Systems, pp. 55-55, 2012.
  • Sabuncuoglu, I. and Bayız, M. “Analysis of Reactive Scheduling Problems in a Job Shop Environment”, European Journal of Operational Research, Vol. 126, No. 3, pp. 567-586, 2000.
  • Saaty, T. “How to Make a Decision: The Analytic Hierarchy Process”, Interfaces, Vol. 24, No. 6, pp. 19-43, 1994.
  • SMEs' Response to the Minimum Wage Increase (2018년 최저임금 인상에 따른 중소기업의 대응방안)
    Kim, K. S. Gyeonggido Business & Science Accelerator, pp. 1-23, 2017 [2018]
  • Ryu, W. S., Hwang, H. C. and Park, C. K. “An Optimization of Process Planning around Quays based on the Yard Customized GIS and the Simulator”, Journal of the Society of Naval Architects of Korea, Vol. 52, No. 2, pp. 97-103, 2015.
  • Roy, B. “The Outranking Approach and the Foundation of ELECTRE Methods”, In A, Carlos and B. Costa (Ed.) Readings in Multiple Criteria Aid. New York: Springer-Verlag. 1990.
  • Roh, M. I. and Lee, K. Y. “Optimal Block Lifting Scheduling Considering the Minimization of Travel Distance at an Idle State and Wire Replacement of a Goliath Crane”, Transactions of the Society of CAD/CAM Engineers, Vol. 15, No. 1, pp. 1-10, 2010.
  • Renzi, C., Leali, F., Cavazzuti, M. and Andrisano, A. O. “A Review on Artificial Intelligence Applications to the Optimal Design of Dedicated and Reconfigurable Manufacturing Systems”, The International Journal of Advanced Manufacturing Technology, Vol. 72, No. 1-4, pp. 403-418, 2014.
  • Qiao, F., Ma, Y. M., Zhou, M. C. and Wu, Q. D. “A Novel Rescheduling Method for Dynamic Semiconductor Manufacturing Systems”, IEEE Transactions on Systems, Man and Cybernetics: Systems, pp. 1-11, 2018.
  • Pyun, K. H. “A Wireless MAC Scheduler based on Video Traces for One-to-one Video-on-demand Services in CDMA2000 1xEV-DO”, Journal of KISS: Information Networking, Vol. 36, No. 4, pp. 351-359, 2009.
  • Piroozfard, H., Wong, K. Y. and Wong, W. P. “Minimizing Total Carbon Footprint and Total Late Work Criterion in Flexible Job Shop Scheduling by Using an Improved Multi-objective Genetic Algorithm”, Resources, Conservation and Recycling, Vol. 128, pp. 267-283, 2018.
  • Pinedo, M. L. “Scheduling: Theory, Algorithms, and System”, Springer, 2016.
  • Pieter, L., Driessche, N. V., Vanhoucke, M. and Causmaecker, P. D. “The Impact of Solution Representations on Heuristic Net Present Value Optimization in Discrete Time/Cost Trade-off Project Scheduling with Multiple Cash Flow and Payment Models”, Computers & Operations Research, Vol. 103, pp. 184-197, 2018.
  • Park. N. R. and Kim, S. H. “A Robust Ship Scheduling Based on Mean-Variance Optimization Model”, Journal of the Korean Operations Research and Management Science Society, Vol. 41, No. 2, pp. 129-139, 2016.
  • Park, Y. M., Park, D. H., Lee, P. L., Nam, S. H., Jeong, Y. K., Ryu, C. H. and Choi, Y. R. “A Study about the System Structure of Master Plan for Manufacturing Scheduling of Mid-size Shipyard”, Proceedings of Winter the Society of CAD/CAM Conference, pp. 906-909, 2016.
  • Park, T. S., Lee, D. U., Lee, C. H., Koo, L. J., Lee, H. Y., Park, S. C. and Wang, G. N. “A Human Centered Decision Support System for Mid-Schedule Planning of Shipbuilding”, Proceeding Winter of Society of CAD/CAM Engineers, pp. 225-230, 2011.
  • Park, S. G. “A Case Study on Production Scheduling for a Job-shop-type Automobile Parts Manufacturing System”, [master’s thesis], [Seoul, Korea]: Hanyang University, 2016.
  • Park, M. G. “A Study on the Development of Material Allocation Scheduling System for Implementing Smart Factory”, [master’s thesis], [Seoul, Korea]: Myongji University, 2018.
  • Park, C. K., Jang, G. S. and Lee, D. H. “An Algorithm Design and Information System Development for Production Scheduling under Make-to-Order Environments”, Journal of Korean Institute of Industrial Engineers – IE Interface, Vol. 16, No. 2, pp. 185-194, 2003.
  • Panorama Consulting Solutions. “Clash of Titans 2019 An Independent Comparison of SAP, Oracle, Microsoft Dynamics and Infor”, ⓒCopyright Panorama Consulting Solutions, pp. 1-16, 2018. Retrieved from www.panorama-consulting.com
  • Panorama Consulting Solutions. “Clash of Titans 2018 An Independent Comparison of SAP, Oracle, Microsoft Dynamics and Infor”, ⓒCopyright Panorama Consulting Solutions, pp. 1-39, 2018. Retrieved from www.panorama-consulting.com
  • Ouelhadj, D. and Petrovic. S. “A Survey of Dynamic Scheduling in Manufacturing Systems”, Journal of Scheduling, Vol. 12, No. 4, pp. 417-431, 2009.
  • Ortiz, M. A., McClean, S. I., Nugent, C. D. and Castillo, A. Y. “Reducing Appointment Lead-time in an Outpatient Department of Gynecology and Obstetrics Through Discrete-event Simulation: A Case Study”, International Conference on Ubiquitous Computing and Ambient Intelligence, pp. 274-285, 2016.
  • Oh, W. G. and Kim, I. J. “The Effects of the 4th Industrial Revolution on the Capability of Smart Manufacturing”, KIPS Transactions on Computer and Communication Systems, Vol. 7, No. 5, pp. 111-118, 2018.
  • Oh, S. Y. “Network Analysis on the Centrality of Airports”, [dissertation]. [Seoul, Korea]: Inha University, 2011.
  • Oh, S. H. “Realization of smart factory management environment of SMEs”, [master’s thesis], [Seoul, Korea]: Hanyang University, 2017.
  • Nouiri, M., Bekrar, A., Jemai, A. and Ammari, A. C. “A New Rescheduling Heuristic for Flexible Job Shop Problem with Machine Disruption Service Orientation in Holonic and Multi-Agent Manufacturing”, pp. 461-476, 2018.
  • Noh, Y. N. “Strategy Trends in Principal Countries toward the 4th Industrial Revolution”, Journal of Electronic and Telecommunications Trends, Vol. 32, No. 2, pp. 1-9, 2017.
  • Noh, C. H., Jang, S. H., Kim, T. Y and Lee, J. S. “Semantic Computing-based Dynamic Job Scheduling Model and Simulation”, Journal of the Korea Society for Simulation, Vol. 18, No. 2, pp. 29-38, 2009.
  • Nam, S. H., Ju, S. H., Ryu, C. H. and Shin, J. G. “The Designing of Production Planning Module for Advanced Planning System with Respect to Supply Chain of the Shipbuilding Industry”, Journal of Computational Design and Engineering, Vol. 21, No. 3, pp. 353-362, 2016.
  • Na, H. B., Son, H. S., Seo, J. W. and Hwang, I. K. “A Study on Process / Facility Methodology for SME Smart Factory”, Journal of the Korean Institute of Plant Engineering, Vol. 23, No. 1, pp. 5-15, 2018.
  • Na, H. B. “Multi-level Job Scheduling in a Flexible Discrete-part Production Environment”, [dissertation], [Seoul, Korea]: Seoul University, 2014.
  • Moon, J. I. “Development of a Competency Framework for Intelligent Factory and Smart Manufacturing in Industry 4.0”, [master’s thesis], [Seoul, Korea]: Donguk University, 2018.
  • Moon, G. J. and Hur, J. H. “Development of an Efficient Vehicle Routing Heuristic using Closely Located Delivery Points and Penalties”, Journal of The Korea Society for Simulation, Vol. 16, No. 3, pp. 1-9, 2007.
  • Microsoft. “Business Application October 2018 Release Notes”, Microsoft Corporation, pp. 1-422, 2018.
  • Lim, C.H. “An Integrated Approach with QFD and PROMETHEE for Decision Making under Requirement Perspective”, Journal of the Korea Management Engineers Society Vol. 17, No. 1, pp. 95-109, 2012.
  • Li, B. H., Hou, B. C., Yu, W, T., Lu, X. B. and Yang, C. W. “Applications of Artificial Intelligence in Intelligent Manufacturing: A Review”, Frontiers of Information Technology & Electronic Engineering, Vol. 18, No. 1, pp. 86-96, 2017.
  • Lee, Y. I. “A Study On Social Network Analysis Among Dept. Tourism Management Curriculum”, International Journal of Tourism and Hospitality Research, Vol. 29, No. 3, pp. 169-178, 2015.
  • Lee, W. S., Lim, W. I. and Koo, P. H. “Transporter Scheduling Based on a Network Flow Model for Dynamic Block Transportation Environment”, IE Interface, Vol. 22, No.1, pp. 63-73, 2009.
  • Lee, W. S., Lim, W. I. and Koo, P. H. “Dynamic Transporter Scheduling for Block Transportation in Shipbuilding”, Proceeding of Spring Korean Institute of Industrial Engineers, pp. 766-773, 2008.
  • Lee, S. J. and Kim, S. H. “Heuristic Method of Load Leveling for Optimal Production in Shipyard”, Proceeding of Autumn Korean Institute of Industrial Engineers, pp. 183-189, 2011.
  • Lee, S. G. “Network Analysis on Peer Rejection in Adolescence”, Journal of Social Welfare Review, Vol. 8, pp. 121-138, 2003.
  • Lee, S, J., Park, S. Y., Park, M. H. and Chung, J. W. “A Mixed Integer Programming Model for Real-Time Scheduling System in TFT-LCD Fab”, Proceeding of Korean Operations Research And Management Society, pp. 663-668, 2010.
  • Lee, K. Y. and Kim, Y. H. “Changes and Characteristics in the Structure of Labor Market Supply and Policy, Journal of Korea Social Research, Vol. 6, pp. 1-45, 2003.
  • Lee, J. Y., Shin, M. S., Bae, S. M. and Lee, H. J. “A Case Study of Optimal Scheduling using Advanced Planning and Scheduling (APS) System”, Proceeding of the Korean Society of Manufacturing Technology Engineers, pp. 240-240, 2014.
  • Lee, J. Y. and Shin, M. S. “Research Trends of Scheduling Techniques in Korea”, Journal of the Society of Korea Industrial and Systems Engineering, Vol. 41, No. 1, pp.56-69, 2018.
  • Lee, J. Y. and Shin, M. S. “Prioritization Mechanism of Work Orders with a Common Due Date in SMEs”, International Journal of Wireless and Mobile Communication for Industrial Systems, Vol. 4, No. 2, 2017.
  • Lee, J. Y. and Kim, K. I. “An Exploratory Study to Respond to Industry 4.0 Dysfunction in Small and Medium Manufacturers”, Journal of Convergence for Information Technology, Vol. 8, No. 3, pp. 169-174, 2018.
  • Lee, J. S., Kim, H. Y., Cho, B. H, Kim, H. J. and Kim, G. D. “Fire Resistance System of MCO Beam Using Fireproof Board”, Journal of the Arch Institute of Korea Structure & Construction, Vol. 55, No. A, pp. 172-178, 2006.
  • Lee, J. M., Kang, K. T. and Noh, D. K. “Cyclic Executive for Autonomous Driving with Real-Time Smart Cruise Control”, Journal of The Korea Society of Computer and Information, Vol. 19, No. 1, pp. 1-8, 2014.
  • Lee, H., Park, Y. J. and Hur, S. “A Preventive Maintenance Scheduling Model of the Cluster Tool”, IE Interfaces, Vol. 25, No. 1, pp. 127-133, 2012.
  • Lee, G. Y., Cho, H. B. and Jung, M. Y. “Period-based Delivery Scheduling Method for Inbound Logistics”, Proceeding of Spring Korean Institute of Industrial Engineers, pp.76-81, 2014.
  • Lee, G. Y. and Jung, M. Y. “Vehicle Scheduling for Inbound Supply Chain”, Proceeding of Spring Korean Institute of Industrial Engineers, pp. 1535-1540, 2013.
  • Lee, D. U., Park, T. S., Koo, L. J., Lee, C. H., Park, S. K., Park, S. C. and Wang, G. N. “An Efficient DB Framework for Scheduling in Ship-building“, Proceedings of the Society of CAD/CAM Conference, pp. 92-98, 2011.
  • Lee, D. R. “Development of a Scheduler for Injection Modeling Shop Considering On time Delivery Rate and Smoothing Ratio of Parts Consumption”, [master’s thesis], [Changwon, Korea]: Changwon National University, 2016.
  • Lee, D. H., Kim, H. S., Bang, K. U. and Jeon, H. K. “An Operation Scheduling System for Pre-Erection and Erection of Shipbuilding“, Proceeding of Autumn Korean Institute of Industrial Engineers, pp. 8-11, 2009.
  • Lee, C. H., Koo, L. J., Lee, H. Y., Park, S. K., Wang, G. N. and Park, S. C. “Research of Input Information Structure Method for Verification of Shipbuilding Block Assembly Shop Scheduling”, Proceedings of the Society of CAD/CAM Conference, pp. 324-330, 2010.
  • Kwon. O. J. “Multi-criteria Decision Making Methodology Theory and Application”, BooksHill. 2018.
  • Kramer, R., Dell’Amico, M. and Iori, M. “A Batching-move Iterated Local Search Algorithm for the Bin Packing Problem With Generalized Precedence Constraints”, International Journal of Production Research, Vol. 55, No. 21, pp. 6288-6304, 2017.
  • Koh, S. G., Jang, J. H., Choi, D. W. and Woo, S. B. “Spatial Scheduling for Mega-block Assembly Yard in Shipbuilding Company”, IE Interfaces, Vol. 24, No. 1, pp. 78-86, 2011.
  • Ko, H., Kim, K. J. and Lee, Y. S. “Location Generalization Method of Moving Object using R*-Tree and Grid”, Journal of The Korean Society Of Computer And Information, Vol. 12, No. 2, pp. 231-242, 2007.
  • King, J. and Navpreet, K. “SAP Certified Application Associate - Strategic Planning (DP/SNP) in SAP APO, Create Space Independent Publishing Platform, 2015.
  • Kim. K. H. and Chung, J. W. “A Study on Multi-criteria Trade-off Structure Between Throughput and WIP Balancing for Semiconductor Scheduling”, Journal of Korean Management Science Review, Vol. 32, No. 4, pp. 69-80, 2015.
  • Kim, Y. H., Park, S. W. and Jun, S. Y. “ Structural Analysis of Online Social Network: centering around Cyworld ilchon”, Journal of Informatization Policy, Vol. 13, No. 4, pp. 167-185, 2006.
  • Kim, Y. H. “Theoretical Framework of Social Network Analysis – Toward and Integration of Structure and Action”, Journal of Korean Journal of Sociology, Vol. 21, No. SM, pp. 31-68, 1987.
  • Kim, Y. B. “Analysis of Research Trends in Social Network Analysis using Topic Modeling and Social Network Analysis”, [master’s thesis]. [Seoul, Korea]: Seoul National University, 2017.
  • Kim, S. Y. “A Case Study of the Introduction of Smart Factory Operation Management(FOM) in the Fourth Industrial Revolution Era”, Journal of Korean Association of Computer and Accounting, Vol. 16, No. 1 pp. 43-62, 2018.
  • Kim, S. H. and Chang, R. S. “The Study on the Research Trend of Social Network Analysis and the its Applicability to Information Science”, Journal of the Korean society for information management, Vol. 27, No. 4, pp. 71-87, 2010.
  • Kim, S. G. “Social Network Analysis (SNA) and Industrial Engineering”, Journal of Industrial Engineering Magazine, Vol. 18, No.1, pp. 24-32, 2011.
  • Kim, S. B. “Development of a Job Scheduling System for an Order”, [master’s thesis]. [Seoul, Korea]: Hongik University, 2002.
  • Kim, M. S. and Hong, S. C. “Set up a Demand Factor of EV Chargers and Its Control Method in Apartments”, Journal of the Korean Institute of IIIuminating and Electrical Installation Engineers, Vol. 28, No. 8, pp. 98-105, 2014.
  • Kim, K. Y. “Priority Decision for Energy Selection Using Fuzzy TOPSIS”, Journal of New & Renewable Energy, Vol. 13, No. 3, pp. 73-84, 2017.
  • Kim, K. Y. and Kim, D. H. “Disaster Recovery Priority Decision of Total Information System for Port Logistics: Fuzzy TOPSIS Approach”, Journal of Korea Society of IT Services Vol. 11, No. 3, pp. 1-16, 2012.
  • Kim, K. M., Kim, J. S., Ji, S. H. and Park, J. R. “Model in the Loop Based Calibration Approach for Cam Phaser Control and Scheduling”, Proceeding of Autumn The Korean Society Of Automotive Engineers, pp. 111-114, 2014.
  • Kim, J. S., Ji, S. H. and Park, J. R. “LPV Modeling of a Variable Intake Manifold”, Proceeding of Autumn The Korean Society Of Automotive Engineers, pp. 93-96, 2011.
  • Kim, J. H. and Park, J. B. “Modeling Planned Maintenance Outage of Generators Based on Advanced Demand Clustering Algorithms”, Transaction of the Korean Institute of Electrical Engineers, Vol. 55, No. A, pp. 172-178, 2006.
  • Kim, J. H. and Han, C. M. “Characteristics and Methods of Bandwidth Allocation According to Flow Features for QoS Control on Flow-Aware Network”, The Institute of Electronics Engineers of Korea – Telecommunications, Vol. 45, No. 9, pp. 39-48, 2008.
  • Kim, J. A., Jeong, J. P., Lee, T. H. and Bae, S. M. “Effectiveness Evaluation of Demand Forecasting Based Inventory Management Model for SME Manufacturing Factory”, Journal of The Institute of Internet, Broadcasting and Communication, Vol. 18, No. 2, pp. 197-207, 2018.
  • Kim, H. Y., Nam, J. H. and Lee, P. L. “Analysis of Production Management System for Simulation of Shipbuilding Scheduling”, Proceeding of Autumn Society of Naval Architects of Korea, pp. 133-136, 2011.
  • Kim, H. C., Doh, H. H., Yu, J. M., Kim, J. G. and Lee, D. H. “A Case Study on Capacitated Lot-sizing and Scheduling in a Paper Remanufacturing System”, Journal of the Society of Korea Industrial and Systems Engineering, Vol. 35, No. 3, pp. 77-86, 2012.
  • Kim, G. Y., Chae, M. S. and Yoo, J. A. “Case Study on Location Tracking System using RFID Active Tag and Improvement of Scheduling System in Semiconductor Manufacturing”, Journal of Korean Institute of Industrial Engineers, Vol. 21, No. 2, pp. 229-236, 2008.
  • Kim, G. T. “TOPSIS for Distribution Channel Selection Problem, Asia-pacific J. Multimedia Services Convergent with Art Humanities and Sociology, Vol. 7, No. 10, pp. 131-139, 2017.
  • Kim, D. H., Choi Y. G. and Cho, G. H. “Industrial Economy Information 12th Industry Outlook 2016”, Korea Institute for Industrial Economics and Trade, 2015.
  • Kim, C. G. and Jang, S. Y. “A Study on the Relationship Between Berth Occupancy Rate and Ship Size at Exclusive Bulk Terminal”, Journal of The Korea Society for Simulation, Vol.17, No. 3, pp. 63-73, 2008.
  • Keum, D. Y., Seo, S. O. and Cho, C. H. “Study on Scheduling of an Apartment for the Electric Vehicle Charging”, Proceeding of Synthesize Korean Society of Automotive Engineers, pp. 1151-1151, 2013.
  • Kasey, P. “Gartner Top 10 Strategic Technology Trends for 2019”, 2018.
  • Kang, S. W., Lee, H. J., Lee, K. H., Kim, J. H. and Roh, B. H. “An Admission Control Mechanism to guarantee QoS of Streaming Service in WLAN”, Journal of the Korean Institute of Communication Sciences, Vol. 34, No. 6, pp. 595-604, 2009.
  • Kang, S. K., Choi, S. J. and Lee, D. R. “Selection of Flood Protection Alternatives Using Multi-Criteria Decision Making, Journal of Korean Society Hazard Mitig, Vol. 17, No. 1, pp. 279-285, 2017.
  • Kang, K. Y. and Kang, Y. H. “Wet station A Development of the Total Management System of the Wet Station”, Journal of Korean Institute of Information Technology, Vol. 6, No. 5, pp. 19-27, 2008.
  • Kang, J. S. and Cho, G. T. “An Analysis of the Effect of Government Support on Automation and Smart Factory”, Journal of Korea technology innovation society, Vol. 21, No. 2, pp. 738-766, 2018.
  • Kang, H. Y. and Kim, J. D. “A Design and Implementation of Bidding and Scheduling System for Ship Repair”, Journal of the Korea Institute of Information and Communication Engineering, Vol. 19, No. 7, pp. 1585-1592, 2015.
  • Kahn, H. S. “The Countermeasures of Domestic Manufacturing in the 4th Industrial Revolution Era: Comparative Analysis on German Manufacturing Industries”, Journal of Product Research, Vol. 36, No.3, pp. 55-66, 2018.
  • Jindal, K., Sinha, R. and Srinivasan, S. “A Multi Agent Structural Design For Production Scheduling Using Distributed Case Based Reasoning”, International Journal of Recent Research Aspects, Vol. 3, No. 3, pp. 106-111, 2016.
  • Jeong, W. I., Oh, H. Y., Park, J. W., Kim, D. Y., Lee, S. H., Choi, T. H. and Ha, S. J. “Block Assembly Monitoring in Shipbuilding Using Overhead Crane Operation Data”, Proceeding of Winter Society for Computational Design and Engineering, pp. 652-655, 2016.
  • Jeong, S. K. and Lee, S. G. “Design and Implementation of Simulation Program for CPU Scheduling in Operation Systems”, Journal of Korea Multimedia Society, Vol. 14, No. 3, pp. 449-461, 2011.
  • Jeong, B. D. and Hong, M. S. “A Study on the Activation Plan of the 4th Industrial Revolution by comparing the Present State of Major Countries”, Journal of the e-Business Studies, Vol. 19, No. 3, pp. 117-131, 2018.
  • Jeong Y. S. “Linking Algorithm 9between IoT devices for smart factory environment of SMEs”, Journal of Convergence for Information Technology, Vol. 8, No. 2, pp. 233-238, 2018.
  • Infor. “Business Intelligence Birst Networked BI”, Birst an Infor Company, pp. 1-2, 2018.
  • Hwang, I. H., Song, J. K., Baek, M. K., Ryu, C. H., Lee, G. K. and Shin, J. K. “Development of Shipbuilding Execution Scheduling Support System using Mobile Device – A Case Study for a Panel Block Assembly Shop”, Journal of the Society of Naval Architects of Korea, Vol. 50, No. 4, pp. 262-271, 2013.
  • Hwang, I. H., Lee, S. M., Nam, S. H., Back, M. G. and Shin, J. G. “A Study on the Application of Assessment System based AHP for Shipyard Production Planning: Focusing on H Company”, Proceedings of the Society of CAD/CAM Conference, pp. 451-453, 2014.
  • Hwang, C. L. and Yoon, K. “Multiple Attribute Decision Making: Methods and Applications, A State of the Art Survey”, New York: Springer-Verlag. 1981.
  • Hong, S. J., Lee, Y. D., Kim, S. K. and Kim, J. H. “Evaluation of Risk Factors to Detect Anomaly in Water Supply Networks based on the PROMETHEE and ANP”, Journal of Korea Water Resources Association, Vol. 39, No. 1, pp. 35-46, 2006.
  • Hitomi, K. “Manufacturing Systems Engineering: A Unified Approach to Manufacturing Technology”, Production Management and Industrial Economics, CRC Press, 1996.
  • Han, S. C. “Predictability of Least Laxity Algorithm”, Proceeding of the Korean Institute of Intelligent Systems, Vol. 18, No. 1, pp. 472-473, 2008.
  • Han, I. J., Kim, J. S., Kwon, O. S. and Heo, H. “Scheduler Design for Yaw Stability Improvement of In-wheel Motor Vehicle”, Proceeding of Synthesize Korean Society for Noise and Vibration Engineering, pp. 212-217, 2011.
  • Hahm, H. J. “A Study of Smart Factory Policy For ICT-Based”, Journal of the e-Business Studies, Vol. 18, No. 6, 2017.
  • Ha, B. H., Son, J. R., Cho, K. K. and Choi, B. C. “A Mathematical Programming Approach for Block Storage Problem in Shipbuilding Process”, Journal of Korean Management Science Review, Vol. 30, No. 3, pp. 99-111, 2013.
  • Gu, M., Gu, J. and Lu, X. “An Algorithm for Multi-agent Scheduling to Minimize the Makespan on m Parallel Machines”, Journal of Scheduling, Vol. 21, No. 5, pp. 483-492, 2018.
  • Goo, B. G. and Chung, H. “A Layered DES Framework for Simulation Based Ship Production Scheduling”, Proceedings of the Society of CAD/CAM Conference, pp. 363-370, 2012.
  • Gironimo, G. D., Lanzotti, A., Peluso, F. and Renno, F. “Virtual Production Planning of a High-speed Train Using a Discrete Event Simulation based Approach”, International Journal on Interactive Design and Manufacturing (IJIDeM), Vol 9, No. 1, pp. 65-75, 2015.
  • Gil, G. H., Kim, B. H. and Kim, D. W. “A Scheduling Management System (SMS) using Order Review and Release (ORR) for Small and Medium Sized Mold and Die Makers”, Proceeding of Spring Korean Institute of Industrial Engineers, pp. 620-623, 2004.
  • Ghezail, F., Pierreval, H. and Gabouj, S. H. “Analysis of Robustness in Proactive Scheduling: A Graphical Approach”, Computers & Industrial Engineering, Vol. 58, No. 2, pp. 193-198, 2010.
  • Gen, M. and Lin, L. “Multiobjective Evolutionary Algorithm for Manufacturing Scheduling Problems: State-of-the-art Survey”, Journal of Intelligent Manufacturing, Vol. 25, No. 5, pp. 849-866, 2014.
  • Gao, K. Z., Suganthan, P. N., Chua, T, J., Chong, S. C., Cai, T. X. and Pan, Q. K. “A Two-stage Artificial Bee Colony Algorithm Scheduling Flexible Job-shop Scheduling Problem with New Job Insertion”, Expert Systems with Applications, Vol. 42, No. 21, pp. 7652-7663, 2015.
  • Fu, Y., Ding, J., Wang, H. and Wang, J. “Two-objective Stochastic Flow-shop Scheduling with Deteriorating and Learning Effect in Industry 4.0-based Manufacturing System”, Applied Soft Computing, Vol. 68, pp. 847-855, 2018.
  • Fera, M., Fruggiero, F., Lambiase, A., Macchiaroli, R. and Todisco, V. “A Modified Genetic Algorithm for Time and Cost Optimization of an Additive Manufacturing Single-machine Scheduling”, International Journal of Industrial Engineering Computations, Vol. 9, No. 4, pp. 423-438, 2018.
  • Eddy, Y. S. F., Gooi, H. B. and Chen, S. X. “Multi-agent System for Distributed Management of Microgrids”, IEEE Transactions on Power Systems, Vol. 30, No. 1, pp. 24-34, 2015.
  • Diaz, J. E., Handl, J. and Xu, D. L. “Integrating Meta-heuristics, Simulation and Exact Techniques for Production Planning of a Failure-prone Manufacturing System”, European Journal of Operational Research, Vol. 266, No. 3, pp. 976-989, 2018.
  • Cupek, R., Ziebinski, A., Huczala, L. and Erdogan, H. “Agent-based Manufacturing Execution Systems for Short-series Production Scheduling”, Computers in Industry, Vol. 82, pp. 245-258, 2016.
  • Choi, S. M., Ahn, J. H. and Moon, S. S. “A Study on the Perspective and Coping Measure of Small and Medium-sized Enterprises in Ulsan City for The Fourth Industrial Revolution”, Journal of Regional Studies, Vol. 26, No. 2, pp. 1-24, 2018.
  • Choi, S. I. “DBpia”, Copyright 1997-2016 NURIMEDIA all rights reserved, Retrieved from http://dbpia.co.kr, 2018.
  • Choi, S. G. “A Study to Measure the Effectiveness and Influence of the World`s Major Airports : Using DEA and Social Network Analysis”, [master’s thesis], [Seoul, Korea]: Inha University, 2013.
  • Choi, G. H., Ha, K. N., Lee, K. C., Lee, S. and Park, J. H. “Dynamic ID Allocation Mechanism Appraisal for improvement of CAN system”, Proceeding of Spring/Autumn The Korean Society Of Automotive Engineers, pp. 1950-1956, 2008.
  • Cho, D. Y., Song, H. C., Cha, J. H., Choi, H. S. and Hwang, H. J. “Simulation Layout of the Control Ground Using 3D Hull Model and Assembly Tree”, Proceedings of the Annual Autumn Meeting, pp. 144-147, 2011.
  • Cheng, J., Feng, C. and Zhou, M. “An Improved Model for Parallel Machine Scheduling Under Time-of-use Electricity Price”, IEEE Transactions on Automation Science and Engineering, Vol. 15, No. 2, pp. 896-899, 2018.
  • Chen, H., Liu, G., Yin, S., Liu, X. and Qui, D. “Erect: Energy-efficient Reactive Scheduling for Real-time Tasks in Heterogeneous Virtualized Clouds”, Journal of Computational Science, No. 28, pp. 416-425, 2018.
  • Chai, J. I. and Park, Y. B. “A Study on Throughput Increase in Semiconductor Package Process of K Manufacturing Company Using a Simulation Model”, Journal of the Korea Society for Simulation, Vol. 19, No. 1, pp. 1-11, 2010.
  • Cha, M, B. and Choi, W. J. “A Study on Application of the CCPM in Pre-Erection Scheduling and Erection Scheduling of Shipbuilding”, Proceeding of Korean Operations Research And Management Society, pp. 594-599, 2009.
  • Braune, R. and Z pfel, G. “Shifting Bottleneck Scheduling for Total Weighted Tardiness Minimization - A Computational Evaluation of Subproblem and Re-optimization Heuristics”, Computers & Operations Research, Vol. 66, pp. 130-140, 2016.
  • Braun, O., Chung, F. and Graham, R. “Worst-case Analysis of the LPT Algorithm for Single Processor Scheduling with Time Restrictions”, OR Spectrum, Vol. 38, No. 2, pp. 531-540, 2016.
  • Brans, J. and Vincke, P. “A Preference Ranking Organization method (The PROMETHEE Method for Multiple Criteria Decision-Making”, Management Science, Vol. 31, No. 6, 1985, pp. 647-656.
  • Belton, V. and T. J. Stewart, “Multiple Criteria Decision Analysis: An Integrated Approach”, Boston: Kluwer Academic Publications, 2002,
  • Bastian M., Heymann S. and Jacomy M. “Gephi: an Open Source Software for Exploring and Manipulating Networks”, International AAAI Conference on Weblogs and Social Media, 2009.
  • Baruwa, O. T., Piera, M. A. and Guasch, A. “Deadlock-free Scheduling Method for Flexible Manufacturing Systems based on Timed Colored Petri nets and Anytime Heuristic Search”, IEEE Transactions on Systems, Man, and Cybernetics: Systems, Vol. 45, No. 5, pp. 831-846, 2015.
  • Baral, M. M. and Amitabh, V. “Cloud-Based Intelligent System for Supply Chain Management: A Future Roadmap for SCM”, Nanoelectronics, Circuits and Communication Systems, Vol. 511, pp 13-24.
  • Bae, H. C., Park, K. C., Cha, B. C. and Moon, I. K. “Scheduling of Shipyard Sub-assembly Process using Genetic Algorithms”, Journal of Industrial Engineering Magazine, Vol. 20, No. 1, pp. 33-40, 2007.
  • Back, M. G., Kim, Y. M., Hwang, I. H., Lee, K. K., Ryu, C. H. and Shin, J. G. “Design and Development of Scenario-Based Simulation System to Improve Shipbuilding Execution Scheduling Assessment− A Case Study on Panel Line−”, Transactions of the Society of CAD/CAM Engineers, Vol. 18, No. 3, pp. 211-223, 2013.
  • An, E. G., Park, S. C. and Wang, G. N. “A Study of Scheduling Planning Methodology of Order Production System”, Proceeding of Spring Korean Institute of Industrial Engineers, pp. 246-250, 2009.
  • Amestoy, P. R., Duff, L. S., L’Excellent, J. Y. and Koster, J. “A Fully Asynchronous Multifrontal Solver Using Distributed Dynamic Scheduling”, SIAM Journal on Matrix Analysis and Applications, Vol. 23, No. 1, pp. 15-41, 2001.
  • Aloulou, M. A., Portmann, M. C. and Vignier, A. “Predictive-reactive Scheduling for the Single Machine Problem”, 8th Workshop on Project Management and Scheduling, Vol. 35, 2002.
  • Almada-Lobo, F. “The Industry 4.0 revolution and the future of Manufacturing Execution Systems (MES)”, Journal of Innovation Management, Vol. 3, No. 4, pp. 16-21, 2016.
  • Ahn, E. G., Seo, J. C. and Park, S. C. “Semiconductor Backend Scheduling Using the Backward Pegging, Transactions of the Society of CAD/CAM Engineers, Vol. 19, No. 4, pp. 402-409, 2014.
  • Ahn, E. G., Chang, D. S. and Park, S. C. “A Study for Improve on Time Delivery in Wafer FAB”, Proceedings of the Winter Society of CAD/CAM Conference, pp. 691-695, 2015.
  • Ahn, C. W. and Hwang, S. G. “Big Data Technologies and Main Issues”, Journal of Korean Institute of Information Scientists and Engineers, Vol. 30, No. 6, pp. 10-17, 2012.
  • Afzalirad, M. and Rezaeian, J. “Design of High-performing Hybrid Meta-heuristics for Unrelated Parallel Machine Scheduling with Machine Eligibility and Precedence Constraints”, Engineering Optimization, Vol. 48, No. 4, pp. 706-726, 2016.
  • Abramovici, M., G bel, J. C. and Neges, M. “Smart Engineering as Enabler for the 4th Industrial Revolution Integrated Systems: Innovations and Applications”, Innovations and applications, pp. 163-170, 2015.