Zack, James G., “CONSTRUCTIVE ACCELERATION – A GLOBAL TOUR”, Navigant Consulting, Inc. (2011)
Wiwen-Nilsson, Tore, “A Brief Review of the 1992 Edition of the ENAA Model Form – International Contract for Process Plant Construction (Turnkey Lumpsum Basis)”, ICLR Vol.11 (1994)
Wickwire, Jon M., Driscoll, Thomas J., Hurlbut, Stephen B., and Groff, Mark J., Construction Scheduling: Preparation, Liability and Claims, (Aspen Publishers; 3 edition, December 18, 2009)
Westersund, Lowell A., FORCE MAJEURE CLAUSES IN CONSTRUCTION CONTRACTS, (Fraser Milner Casgrain LLP, 2008) http://www.herbertsmithfreehills.com/-/media/HS/T-300312-6.pdf
Werremeyer, Kit, Understanding & Negotiating Construction Contracts (RSMeans; 1st edition, September 29, 2006)
Wendy Kennedy Venoit et al,(Eds), International Construction Law, (ABA, 2009)
Wallace, Ian Duncan, Construction contracts: Principles and Policies in tort and contract, (Sweet&Maxwell, 1986)
Venoit, Wendy Kennedy, [et al.], International construction law : a guide for cross-border transactions and legal disputes, (Chicago : American Bar Association, 2009)
Varady, Tibor, [et al.], International Commercial Arbitration: A Transnational Perspective, (WEST 5th Ed. 2012)
Uff, John, Construction law :law and practice relating to the construction industry, 10th ed. (London : Sweet & Maxwell, 2009)
Trauner, Theodore J., Construction delays :understanding them clearly, analyzing them correctly (2nd ed.), (Boston : Butterworth-Heinemann, 2009)
The Technology And Construction Court Guide (Second edition issued 3rd October 2005, third revision with effect from 3 March 2014)
The Society of Construction Law (SCL), Delay and Disruption Protocol, 2002.10.
Stannard, John E., Delay in the Performance of Contractual Obligations, (Oxford University Press 2007)
Soimulescu, O. and Brown, D., "Enforcement of Binding DAB Decisions: A Fresh Approach to Clause 20 of the 1999 FIDIC Conditions of Contract", ICLR Vol.29 No.1, (LLOYDS OF LONDON PRESS LTD, 2012)
Sepp l , Christopher R., “The Development of a Case Law in Construction Disputes relating to FIDIC Contracts”, ICLR Vol.26 No.1, (LLOYDS OF LONDON PRESS LTD, 2009)
Sepp l , Christopher R., “Enforcement by an Arbitral Tribunal of a Binding but Not Final Engineer’s or DAB’s Decision under the FIDIC Conditions” ICLR(2009)
Schwenzer, Ingeborg, “FORCE MAJEURE AND HARDSHIP IN INTERNATIONAL SALES CONTRACTS”, 39 VUWLR (2008)
Sakr, Marwan, “Turnkey Contracting under the ICC Model Contract for Major Projects: A Middle Eastern Law Perspective”, ICLR Vol.26 (2009)
Robinson, Michael D., A Contractor's Guide to the FIDIC Conditions of Contract (John Wiley & Sons, Ltd ; 1 edition (June 7, 2011)
Rivkin, David R., Lex Mercatoria and Force majeure, in: Gaillard (ed.), Transnational Rules in International Commercial Arbitration (ICC Publ Nr. 480,4), Paris 1993.
Pulkowski, J. F., “The Subcontractor's Direct Claim in International Business Law”, ICLR Vol.21 No.1, (LLOYDS OF LONDON PRESS LTD, 2004)
McMillan, Daniel D., & Rubin, Robert A., “Dispute Review Boards: Key Issues, Recent Case Law, and Standard Agreements”, The Construction Lawyer Vol.25, No.2, American Bar Association, (2005)
McKendrick, Ewan, “Preparing for the Unexpected: Force Majeure and Hardship Clauses in Practice”, A paper presented to the Centre of Construction Law 25th Anniversary Conference held at King's College London on 28th June 2012, (2013.1), www.scl.org.uk
Lightburn, E., “Mediation in International Construction Disputes”, ICLR Vol.17 No.1, (LLOYDS OF LONDON PRESS LTD, 2000)
Levin, Paul, Construction Contract Claims, Changes & Dispute Resolution (Amer Society of Civil Engineers; 2 Sub edition, June 1998)
Knutson, Robert, FIDIC – Analysis of the International Construction Contracts, (Kluwer Law, 2005)
Knowles, J. Roger, 150 Contractual Problems and Their Solutions, (Wiley-Blackwell; 2 edition, May 16, 2005)
Keane, P. John & Caletka, Anthony F., Delay Analysis in Construction Contracts, John Wiley & Sons, 2008.
Jenkins, Jane and Stebbings, Simon , International Construction Arbitration Law, (Kluwer Law International, October 26, 2006)
Jaynes, Gordon L., “Turnkey Contracts: Japan’s Model Forms”, ICLR Vol.10 (1993)
Jaeger, Axel-Volkmar and H k, G tz-Sebastian , FIDIC - A Guide for Practitioners (Springer; 1 edition, December 7, 2009)
J rgensen, Jacob C., Delay clauses in international construction contracts, Kluwer Law International, 2010
International Chamber of Commerce, “ICC Force Majeure Clause 2003 - ICC Hardship Clause 2003”, ICC Commission on Commercial Law and Practice, ICC Pub.,2003
Hoshi, Hiromi, “ENAA Model Form of Contract for Power Plant Construction”, ICLR Vol.14 (1997)
Hondius, Ewoud H., and Grigoleit, Hans Christoph, “Change of Circumstances in European Contract Law – An Approach to the Relevant Issues and Doctrines”, Unexpected Circumstances in European Contract Law, (Cambridge University Press, March 2011)
Hondius, Ewoud H., and Grigoleit, Hans Christoph(eds.), Unexpected Circumstances in European Contract Law, (Cambridge University Press, March 2011)
Hinze, Jimmie, Construction Contracts, (McGraw-Hill, 2010)
Hinchey, J.W., “Rethinking Conflict in Construction Project Delivery and Dispute Resolution”, ICLR Vol.29 No.1, (LLOYDS OF LONDON PRESS LTD, 2012)
Hanafi, S., “International Construction Contracts and Dispute Resolution: An Egyptian Perspective”, ICLR Vol.22 No.4, (LLOYDS OF LONDON PRESS LTD, 2005)
H. Randolph Thomas & Ralph D. Ellis (Author), Jr., Interpreting Construction Contracts: Fundamental Principles for Contractors, Project Managers, and Contract Administrators, (American Society of Civil Engineers (November 1, 2007)
Gould, Nicholas, “Dispute resolution in the construction industry : An overview”, 「Construction Law seminar: Introduction to the basics」(2004)
Gould, Nicholas, “Comments on the ENAA Model Form International Contract for Process Plant Construction (Revised 1992)”, ICLR Vol.11 (1994)
Goudsmit, J.J., “The EIC (European International Contractors) Turnkey Contract (Conditions for Design and Construction Projects)”, ICLR Vol.12 (1995)
Gotanda, John Y., “Renegotiation and Adaptation Clauses in Investment Contracts, Revisited”, VANDERBILT JOURNAL OF TRANSNATIONAL LAW Vol.36:1461 (2003.8) http://works.bepress.com/gotanda/8
Goldman, Berthold, "The Applicable Law: General Principle of Law: the Lex Mercatoria", Contemporary Problems in International Arbitration, (Sweet & Maxwell, 1986).
Glazov, Joshua, “Choice of Governing Law in Construction Contracts and Architects Agreements”, http://www.constructionlawtoday.com (2009.3.)
Gillion, Frederic, “Enforcement of DAB Decisions under the 1999 FIDIC Conditions of Contract: A Recent Development: CRW Joint Operation v. PT Peninsula Gas Negara (Persero) TBK” ICLR (2011)
Gibson, Roger, Construction Delays: Extensions of Time and Prolongation Claims (Routledge; 1 edition, June 20, 2008)
Gad, Ghada Moustafa, “Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts”, 「PHD dissertation Iowa State University」(2012)
Furuya, Kunihiko, “ENAA Revised Model Form of Contract (1992) Edition”, ICLR Vol.10 (1993)
Fucci, Frederick R., “Hardship and Changed Circumstances as Grounds for Adjustment or Non-Performance of Contracts”, http://www.cisg.law.pace.edu/cisg/biblio/fucci.html
Flambouras, "The doctrine of Impossibility and Clausula Rebus Sic Stantibus in the 1980 Convention on Contracts for the International Sale of Goods and the Principles of European Contract Law-A Comparative Analysis", 13 Pace Int'l L. Rev. 261 (2001).
FIDIC, Conditions of Contract for Plant and Design-Build, First Edition 1999
FIDIC, Conditions of Contract for EPC/Turnkey Project, First Edition 1999
FIDIC, Conditions of Contract for Design, Build and Operate Projects, 2008
FIDIC, Conditions of Contract for Construction, First Edition 1999
Elmarsafi, Gamal M, "Interorganizational collaboration: Transformation strategies to reduce construction disputes in the construction industry", (Capella University School of Business, 2008)
Eggleston, Brian, Liquidated Damages and Extensions of Time: In Construction Contracts (Wiley-Blackwell; 3 edition, February 17, 2009)
Dunn , Jan Van, “The Changing of the Guard: Force Majeure and Frustration in Construction Contracts: The Foreseeability Requirement Replaced by Normative Risk Allocation”, ICLR (2002)
Dezalay, Yves and Garth, Bryant G., Dealing in virtue : international commercial arbitration and the construction of a transnational legal order (Chicago : University of Chicago Press, 1996)
Derek Simmonds, Statutory Adjudication: A Practical Guide, (Blackwell Publishing, 2008)
Davis, Michael E., Technology and Construction Court : Practice and Procedure (Oxford U.K : 2006)
Cushman, Esq., Robert F., Carter, John D., Gorman, Paul J., and Coppi, Douglas F., Proving and Pricing Construction Claims (Aspen Publishers, Inc.; 3 edition, December 27, 2010)
Cunnington, Ralph and Djakhongir, Saidov, Contract Damages(Domestic and International Perspectives) (Intl Specialized Book Service Inc, June 1, 2008)
Christie, R.H., “The Law Governing an International Construction Contract”, ICLR Vol.24 No.3 (LLOYDS OF LONDON PRESS LTD, 2007)
Chen, Jieh-Haur, "Litigation prediction model for construction disputes caused by change orders", (The University of Wisconsin - Madison, 2003)
Chappell, David Cowlin, Michael Dunn, Michael , Building law encyclopaedia, (Wiley-Blackwell, 2009)
Callahan, Michael T., Construction Change Order Claims (Aspen Publishers; 2 edition, September 21, 2005)
Brunner, Christoph, Force majeure and hardship under general contract principles : exemption for non-performance in international arbitration, (Austin : Wolters Kluwer Law & Business, 2009)
Bruner, P. L., “Force Majeure under International Law and International Construction Contract Model Forms”, ICLR Vol.12 No.2, (LLOYDS OF LONDON PRESS LTD, 1995)
Bramble, Barry B. and Callahan, Michael T., Construction Delay Claims, (Aspen Publishers; 4 edition, October 26, 2010)
Bell, Gordon F., “Resolving international construction disputes – litigation or arbitration?”, http://www.reedsmith.com (2012.10.)
Arakeeb, Walaa, "The Vitality Of Construction Contract Provisions Within The Scope Of The Egyptian Legal System" Annual conference 18th Building and Construction contracts Between Traditional legal Rules&Developed Legal Systems, (2010)
Allen, Mike, “Global Construction Dispute”, Global Construction Disputes Report 2015 (2015)