열차 속도향상에 따른 전차선로 집전성능 검증 및 유지보수 활용에 관한 연구 = A study on the current collecting performance verification and maintenance due to the train speed-up in catenary system
'
열차 속도향상에 따른 전차선로 집전성능 검증 및 유지보수 활용에 관한 연구 = A study on the current collecting performance verification and maintenance due to the train speed-up in catenary system' 의 주제별 논문영향력
논문영향력 요약
주제
hemu-430x
고속 철도
전기아크
전차선로
접촉력
팬터그래프
동일주제 총논문수
논문피인용 총횟수
주제별 논문영향력의 평균
168
0
0.0%
주제별 논문영향력
논문영향력
주제
주제별 논문수
주제별 피인용횟수
주제별 논문영향력
주제어
hemu-430x
8
0
0.0%
고속 철도
117
0
0.0%
전기아크
5
0
0.0%
전차선로
12
0
0.0%
접촉력
12
0
0.0%
팬터그래프
14
0
0.0%
계
168
0
0.0%
* 다른 주제어 보유 논문에서 피인용된 횟수
0
'
열차 속도향상에 따른 전차선로 집전성능 검증 및 유지보수 활용에 관한 연구 = A study on the current collecting performance verification and maintenance due to the train speed-up in catenary system' 의 참고문헌
“A study on improvement of railway test standard about normal (high speed) and high speed rail”, KRRI research report, 2011.
Y. Park, Y. H. Cho, S. Y. Kwon, K. Lee, W. You, “Development of an Arc Detector Assessment System by Loss of Contact Between Pantograph and Contact Wire in Electric Railway”, The Transactions of the Korean Institute of Electrical Engineers, Vol. 60, No. 11, pp. 2171-2175, 2011. 11.
UIC Code 794, “Pantograph-Overhead Line interaction on the European high-speed network”, International Union of Railway, 1996.
T. Kobayashi, Y. Fujihasi, T. Tsuburaya, J. I. Satoh, Y. Oura, Y, Fujii, “Current collecting performance of overhead contact line-pantograph system at 425 km/h”, Electrical Engineering in Japan, Vol. 124, Issue 3, pp. 73–81, 1998. 8.
T. Hayasaka, M. Shimizu, “Study on Mean to Detecting Ultraviolet Rays at Optical Measurement of Contact Loss,” 2008 Annual Meeting Record IEE Japan, No.5-098, pp. 156-157 . 2008. 3.
S. Y. Kwon, C. M. Park, Y. Park, K. Lee, Y. H. Cho, K. T. Eum, S. W. Kim, H. K. Oh, “Comparative review of the current collection quality parameters between catenary and pantograph by measuring the contact force and arcs simultaneously during new Korean high speed train trial runs”, WCRR, 2013.
K. Y. Um, Y, G. Park, S. H. Lee, “Development of Test-bad Infra Technologies for 400 km/h High Speed Railway”, Railway Journal, Vol. 15, No. 4, pp. 55-60, 2012. 8.
K. Nezu, T. Hayasaka, F. Tanamoto, “Fundamental Examination of UV-Optocal Type Contact Loss Measurement Equipment,” 2008 Annual Meeting Record IEE Japan, No.5-098, pp.158-159 , 2008. 3.
IEC 62486:2010, “International Standard, Railway applications-Current collection systems- Technical criteria for the interaction between pantograph and overhead line”, 2010.
EN 50367:2006 “Railway applications-Current collection systems- Technical criteria for the interaction between pantograph and overhead line(to achieve free access).”, 2006.
EN 50317:2001, “The European Standard, Railway applications-Current collection systems- Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line”, 2001.
EN 50119:2001, “The European Standard, Railway applications-Fixed installations-Electric traction overhead contact lines”, 2001.
'
열차 속도향상에 따른 전차선로 집전성능 검증 및 유지보수 활용에 관한 연구 = A study on the current collecting performance verification and maintenance due to the train speed-up in catenary system'
의 유사주제(
) 논문