'
데이터마이닝기반의 BIM 적용단계별 성과평가 모형 및 시스템 개발 = Development of Performance Assessment Model and System for BIM by Application Phases Using Data Mining Method' 의 주제별 논문영향력
논문영향력 요약
주제
CoBiT
Performance Assessment
bim
roi
동일주제 총논문수
논문피인용 총횟수
주제별 논문영향력의 평균
439
0
0.0%
주제별 논문영향력
논문영향력
주제
주제별 논문수
주제별 피인용횟수
주제별 논문영향력
주제어
CoBiT
1
0
0.0%
Performance Assessment
44
0
0.0%
bim
340
0
0.0%
roi
55
0
0.0%
계
440
0
0.0%
* 다른 주제어 보유 논문에서 피인용된 횟수
0
'
데이터마이닝기반의 BIM 적용단계별 성과평가 모형 및 시스템 개발 = Development of Performance Assessment Model and System for BIM by Application Phases Using Data Mining Method' 의 참고문헌
Succar, B. 2010. The Five Components of BIM Performance Measurement. CIB World Congress, Salford, United Kingdom
Succar, B. 2009b. Building Information Modeling Maturity Matrix. Handbook of Research on Building Information Modeling and Construction Informatics: Concepts and Technologies : 65 -102
Succar, B. 2009a. Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction. 18(3) : 357 - 375
Sen, S. 2012. The Impact of BIM/VDC on ROI - Developing a Financial Model for Savings and ROI Calculation of Construction Projects. KTH Architecture and the Built Environment. A master s thesis
Poirier, E. A., Staub-French, S., and Forgues, D. 2015. Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research. Automation in Construction. 58 : 74- 84
Patrick, C. S. 2009. Evaluating the Impact of Building Information Modeling (BIM) on Construction. University of Florida. A doctor s thesis
MsGRAW HILL CONSTRUCTION. 2014. SmartMarket Report
Moon, H., Kim, H., Kamat, V., and Kang, L. 2015. BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps. Journal of Computing in Civil Engineering. 29(3)
McCuen, T. L. 2008. Building Information Modeling and the Interactive Capability Maturity Model. Associated Schools of Construction International Proceedings of the 44th Annual Conference. Auburn, Alabama.
Lu, W., Peng, Y., Shen, Q., and Li, H. 2013. Generic Model for Measuring Benefits of BIM as a Learning Tool in Construction Tasks. Journal of Construction Engineering and Management . 139(2) : 195 - 203
Love, P. E. D., Matthews, J., Simpson, I., Hill, A., and Olatunji, A. 2015. A benefits realization management building information modeling framework for asset owners. Automation in Construction. 37 : 1 - 10
Hoffer, E. R. 2004. Measuring the value of BIM: Achieving Strategic ROI. Autodesk
Giel, B., Issa, R. A., and Liu, R. 2012. Perceptions of Organizational BIM Maturity Variables within the US AECO Industry. Proceedings of the CIB W78 2012 : 29th International Conference. Beirut, Lebanon
Giel, B. and Issa, R. 2013. Return on investment analysis of building information modeling in construction. Journal of Computing in Civil Engineering. 27(5) : 511-521
GAO. 2000. A Framework for Assessing and Improving Process Maturity. GAO
Chien, K. F., Wu, Z. H., and Huang, S. C. 2014. Identifying and assessing critical risk factors for BIM projects : Empirical study. Automation in Construction. 45 : 1 – 15
Building and Construction Authority. 2012. Singapore BIM Guide.
Bryde, D., Broquetas, M., and Volm, J. M. 2013. The project benefits of Building Information Modelling (BIM). International Journal of Project Management . 31 : 971 – 980
Becerik-Gerber, B. and Rice, S. 2010. The perceived value of building information modeling in the US building industry. Journal of Information Technology in Construction. 15 : 185 - 201
Barlish, K. and Sullivan, K. 2012. How to measure the benefits of BIM - A case study approach. Automation in Construction. 24 : 149 - 159
AZHAR, S. 2011. Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry. Leadership and Management in Engineering. 11(3) : 241-252
'
데이터마이닝기반의 BIM 적용단계별 성과평가 모형 및 시스템 개발 = Development of Performance Assessment Model and System for BIM by Application Phases Using Data Mining Method'
의 유사주제(
) 논문