박사

Flexible Inventory Models for Imperfect Manufacturing Systems

MisbahUllah 2015년
논문상세정보
' Flexible Inventory Models for Imperfect Manufacturing Systems' 의 주제별 논문영향력
논문영향력 선정 방법
논문영향력 요약
주제
  • imperfect production
  • inventory control
  • mathematical modeling
  • optimization
  • quality
동일주제 총논문수 논문피인용 총횟수 주제별 논문영향력의 평균
1,276 0

0.0%

' Flexible Inventory Models for Imperfect Manufacturing Systems' 의 참고문헌

  • Wee, H.-M., Wang, W.-T. and Yang, P.-C., “A production quantity model for imperfect qualityitems with shortage and screening constraint,” International Journal of ProductionResearch, Vol. 51, No. 6, pp. 1869-1884, 2013.
  • Wee, H.-M., Wang, W.-T. and Yang, P.-C., “A production quantity model for imperfect qualityitems with shortage and screening constraint,” International Journal of ProductionResearch, Vol. 51, No. 6, pp. 1869-1884, 2012.
  • Wee, H. M., Yu, J. and Chen, M. C., “Optimal inventory model for items with imperfect qualityand shortage backordering,” Omega, Vol. 35, No. 1, pp. 7-11, 2007.
  • Wee, H. M. and Widyadana, G. A., “Economic production quantity models for deterioratingitems with rework and stochastic preventive maintenance time,” International Journalof Production Research, Vol. 50, No. 11, pp. 2940-2952, 2011.
  • Ullah, M. and Kang, C. W., “Effect of rework, rejects and inspection on lot size with work-inprocessinventory,” International Journal of Production Research, Vol. 52, No. 8, pp.2448-2460, 2014.
  • Teng, J.-T., Yang, H.-L. and Chern, M.-S., “Economic order quantity models for deterioratingitems and partial backlogging when demand is quadratic in time,” European Journalof Industrial Engineering, Vol. 5, No. 2, pp. 198-214, 2011.
  • Taleizadeh, A. A., Cardenas-Barron, L. E. and Mohammadi, B., “A deterministic multi productsingle machine EPQ model with backordering, scraped products, rework andinterruption in manufacturing process,” International Journal of ProductionEconomics, Vol. 150, pp. 9-27, 2014.
  • Taheri-Tolgari, J., Mirzazadeh, A. and Jolai, F., “An inventory model for imperfect items underinflationary conditions with considering inspection errors,” Computers & Mathematicswith Applications, Vol. 63, No. 6, pp. 1007-1019, 2012.
  • Taft, E., “The most economical production lot,” Iron Age, Vol. 101, No. 18, pp. 1410-1412,1918.
  • Silver, E. A., Pyke, D. F. and Peterson, R., Inventory management and production planningand scheduling: Wiley New York, 1998.
  • Shekarian, E., Jaber, M. Y., Kazemi, N. and Ehsani, E., “A fuzzified version of the economicproduction quantity (EPQ) model with backorders and rework for a single-stagesystem,” European Journal of Industrial Engineering, Vol. 8, No. 3, pp. 291-324,2014.
  • Sarker, B. R., Jamal, A. M. M. and Mondal, S., “Optimal batch sizing in a multi-stageproduction system with rework consideration,” European Journal of OperationalResearch, Vol. 184, No. 3, pp. 915-929, 2008.
  • Sarkar, B., “An inventory model with reliability in an imperfect production process,” AppliedMathematics and Computation, Vol. 218, No. 9, pp. 4881-4891, 2012.
  • Sarkar, B., Cardenas-Barron, L. E., Sarkar, M. and Singgih, M. L., “An economic productionquantity model with random defective rate, rework process and backorders for a singlestage production system,” Journal of Manufacturing Systems, Vol. 33, No. 3, pp. 423-435, 2014.
  • Sana, S. S., “An economic production lot size model in an imperfect production system,”European Journal of Operational Research, Vol. 201, No. 1, pp. 158-170, 2010.
  • Sana, S. S., Goyal, S. K. and Chaudhuri, K., “An imperfect production process in a volumeflexible inventory model,” International Journal of Production Economics, Vol. 105,No. 2, pp. 548-559, 2007.
  • Sana, S. S. and Chaudhuri, K., “An EMQ model in an imperfect production process,”International Journal of Systems Science, Vol. 41, No. 6, pp. 635-646, 2010.
  • San-Jose, L. A., Garcia-Laguna, J. and Sicilia, J., “An economic order quantity model withpartial backlogging under general backorder cost function,” TOP, Vol. 17, No. 2, pp.366-384, 2009.
  • Salameh, M. and Jaber, M., “Economic production quantity model for items with imperfectquality,” International journal of production economics, Vol. 64, No. 1, pp. 59-64,2000.
  • Rosenblatt, M. J. and Lee, H. L., “Economic production cycles with imperfect productionprocesses,” IIE transactions, Vol. 18, No. 1, pp. 48-55, 1986.
  • Rezaei, J., "Economic order quantity model with backorder for imperfect quality items." pp.466-470.
  • Rahim, M. and Al-Hajailan, W., “An optimal production run for an imperfect productionprocess with allowable shortages and time-varying fraction defective rate,” TheInternational Journal of Advanced Manufacturing Technology, Vol. 27, No. 11-12, pp.1170-1177, 2006.
  • Porteus, E. L., “Optimal lot sizing, process quality improvement and setup cost reduction,”Operations research, Vol. 34, No. 1, pp. 137-144, 1986.
  • Parveen, M. and Rao, T., “Optimal batch sizing, quality improvement and rework for animperfect production system with inspection and restoration,” European Journal ofIndustrial Engineering, Vol. 3, No. 3, pp. 305-335, 2009.
  • Pal, B., Sana, S. S. and Chaudhuri, K., “A mathematical model on EPQ for stochastic demandin an imperfect production system,” Journal of Manufacturing Systems, Vol. 32, No.1, pp. 260-270, 2013.
  • Ojha, D., Sarker, B. and Biswas, P., “An optimal batch size for an imperfect production systemwith quality assurance and rework,” International Journal of Production Research,Vol. 45, No. 14, pp. 3191-3214, 2007.
  • Ojha, D., Sarker, B. R. and Biswas, P., “An optimal batch size for an imperfect productionsystem with quality assurance and rework,” International Journal of ProductionResearch, Vol. 45, No. 14, pp. 3191-3214, 2007.
  • Mohammadi, B., Taleizadeh, A. A., Noorossana, R. and Samimi, H., “Optimizing integratedmanufacturing and products inspection policy for deteriorating manufacturing systemwith imperfect inspection,” Journal of Manufacturing Systems, No. 0.
  • Maddah, B., Salameh, M. K. and Karame, G. M., “Lot sizing with random yield and differentqualities,” Applied Mathematical Modelling, Vol. 33, No. 4, pp. 1997-2009, 2009.
  • Maddah, B., Moussawi, L. and Jaber, M. Y., “Lot sizing with a Markov production processand imperfect items scrapped,” International Journal of Production Economics, Vol.124, No. 2, pp. 340-347, 2010.
  • Liu, J. J. and Yang, P., “Optimal lot-sizing in an imperfect production system withhomogeneous reworkable jobs,” European Journal of Operational Research, Vol. 91,No. 3, pp. 517-527, 1996.
  • Lin, G. C. and Kroll, D. E., “Economic lot sizing for an imperfect production system subjectto random breakdowns,” Engineering Optimization, Vol. 38, No. 1, pp. 73-92, 2006.
  • Lin, C. S., “Integrated production-inventory models with imperfect production processes anda limited capacity for raw materials,” Mathematical and Computer Modelling, Vol. 29,No. 2, pp. 81-89, 1999.
  • Khan, M., Jaber, M. Y., Guiffrida, A. L. and Zolfaghari, S., “A review of the extensions of amodified EOQ model for imperfect quality items,” International Journal ofProduction Economics, Vol. 132, No. 1, pp. 1-12, 2011.
  • Khan, M., Jaber, M. Y. and Wahab, M. I. M., “Economic order quantity model for items withimperfect quality with learning in inspection,” International Journal of ProductionEconomics, Vol. 124, No. 1, pp. 87-96, 2010.
  • Khan, M., Jaber, M. Y. and Bonney, M., “An economic order quantity (EOQ) for items withimperfect quality and inspection errors,” International Journal of ProductionEconomics, Vol. 133, No. 1, pp. 113-118, 2011.
  • Karimi-Nasab, M. and Sabri-Laghaie, K., “Developing approximate algorithms for EPQproblem with process compressibility and random error in production/inspection,”International Journal of Production Research, Vol. 52, No. 8, pp. 2388-2421, 2014.
  • Jans, R. and Degraeve, Z., “Modeling industrial lot sizing problems: a review,” InternationalJournal of Production Research, Vol. 46, No. 6, pp. 1619-1643, 2007.
  • Jamal, A., Sarker, B. R. and Mondal, S., “Optimal manufacturing batch size with reworkprocess at a single-stage production system,” Computers & Industrial Engineering,Vol. 47, No. 1, pp. 77-89, 2004.
  • Jamal, A. M. M., Sarker, B. R. and Mondal, S., “Optimal manufacturing batch size with reworkprocess at a single-stage production system,” Computers & Industrial Engineering,Vol. 47, No. 1, pp. 77-89, 2004.
  • Jaggi, C. and Verma, P., “Joint optimization of price and order quantity with shortages for atwo-warehouse system,” TOP, Vol. 16, No. 1, pp. 195-213, 2008.
  • Jaber, M. Y., “Lot sizing for an imperfect production process with quality correctiveinterruptions and improvements, and reduction in setups,” Computers & IndustrialEngineering, Vol. 51, No. 4, pp. 781-790, 2006.
  • Hu, W.T., Kim, S.L. and Banerjee, A., “An inventory model with partial backordering and unitbackorder cost linearly increasing with the waiting time,” European Journal ofOperational Research, Vol. 197, No. 2, pp. 581-587, 2009.
  • Hsu, L.-F., “Erratum to “An economic order quantity (EOQ) for items with imperfect qualityand inspection errors” International Journal of Production Economics, Vol. 136, No.1, pp. 253, 2012.
  • Harris, F. W., “How many parts to make at once,” Operations Research, Vol. 38, No. 6, pp.947-950, 1990.
  • Gupta, T. and Chakraborty, S., “Looping in a multistage production system,” THEInternational Journal of Production Research, Vol. 22, No. 2, pp. 299-311, 1984.
  • Gunasekaran, A., Korukonda, A. R., Vtrtanen, I. and Yli-Olli, P., “Optimal investment and lotsizingpolicies for improved productivity and quality,” International Journal ofProduction Research, Vol. 33, No. 1, pp. 261-278, 1995.
  • Chiu, Y. P., “Determining the optimal lot size for the finite production model with randomdefective rate, the rework process, and backlogging,” Engineering Optimization, Vol.35, No. 4, pp. 427-437, 2003.
  • Chiu, S. W., Wang, S.-L. and Chiu, Y.-S. P., “Determining the optimal run time for EPQ modelwith scrap, rework, and stochastic breakdowns,” European Journal of OperationalResearch, Vol. 180, No. 2, pp. 664-676, 2007.
  • Chiu, S. W., Ting, C.K. and Chiu, Y.-S. P., “Optimal production lot sizing with rework, scraprate, and service level constraint,” Mathematical and Computer Modelling, Vol. 46,No. 3?4, pp. 535-549, 2007.
  • Chiu, S. W., Gong, D.C. and Wee, H.-M., “Effects of random defective rate and imperfectrework process on economic production quantity model,” Japan Journal of Industrialand Applied Mathematics, Vol. 21, No. 3, pp. 375-389, 2004.
  • Cheng, T., “An economic order quantity model with demand-dependent unit production costand imperfect production processes,” IIE transactions, Vol. 23, No. 1, pp. 23-28, 1991.
  • Chen, Y. C., “An optimal production and inspection strategy with preventive maintenance errorand rework,” Journal of Manufacturing Systems, Vol. 32, No. 1, pp. 99-106, 2013.
  • Chan, W., Ibrahim, R. and Lochert, P., “A new EPQ model: integrating lower pricing, reworkand reject situations,” Production Planning & Control, Vol. 14, No. 7, pp. 588-595,2003.
  • Cardenas-Barron, L. E., “Optimal manufacturing batch size with rework in a single-stageproduction system ? A simple derivation,” Computers & Industrial Engineering, Vol.55, No. 4, pp. 758-765, 2008.
  • Cardenas-Barron, L. E., “On optimal manufacturing batch size with rework process at singlestageproduction system,” Computers & Industrial Engineering, Vol. 53, No. 1, pp.196-198, 2007.
  • Cardenas-Barron, L. E., “On optimal batch sizing in a multi-stage production system withrework consideration,” European Journal of Operational Research, Vol. 196, No. 3,pp. 1238-1244, 2009.
  • Cardenas-Barron, L. E., “Observation on: “Economic production quantity model for items withimperfect quality” [Int. J. Production Economics 64 (2000) 59?64],” InternationalJournal of Production Economics, Vol. 67, No. 2, pp. 201, 2000.
  • Cardenas-Barron, L. E., “Economic production quantity with rework process at a single-stagemanufacturing system with planned backorders,” Computers & IndustrialEngineering, Vol. 57, No. 3, pp. 1105-1113, 2009.
  • Boucher, T. O., “Lot sizing in group technology production systems,” International Journal ofProduction Research, Vol. 22, No. 1, pp. 85-93, 1984.
  • Biswas, P. and Sarker, B. R., “Optimal batch quantity models for a lean production systemwith in-cycle rework and scrap,” International Journal of Production Research, Vol.46, No. 23, pp. 6585-6610, 2008.
  • Ben-Daya, M., Noman, S. M. and Hariga, M., “Integrated inventory control and inspectionpolicies with deterministic demand,” Computers & operations research, Vol. 33, No.6, pp. 1625-1638, 2006.
  • Ben-Daya, M. and Rahim, A., “Optimal lot-sizing, quality improvement and inspection errorsfor multistage production systems,” International Journal of Production Research,Vol. 41, No. 1, pp. 65-79, 2003.
  • Ben-Daya, M. and Hariga, M., “Economic lot scheduling problem with imperfect productionprocesses,” Journal of the Operational Research Society, Vol. 51, No. 7, pp. 875-881,2000.
  • Barzoki, M. R., Jahanbazi, M. and Bijari, M., “Effects of imperfect products on lot sizing withwork in process inventory,” Applied Mathematics and Computation, Vol. 217, No. 21,pp. 8328-8336, 2011.